My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/11/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 04/11/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:31:41 PM
Creation date
4/10/2017 9:28:31 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/11/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
754
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. FINANCING <br /> 5.1 Opinion of Cost <br /> A detailed opinion of probable costs for the proposed improvements can be found in Appendix B <br /> of this report. The opinion of probable costs incorporates anticipated 2017 construction costs for <br /> the proposed improvements plus 23% indirect costs for administrative, engineering, financing <br /> and legal costs. Construction contingency costs are not included in the estimated costs. <br /> City staff prepared the Feasibility Report in-house as part of staff's normal duties. <br /> WSB and Associates, Inc. prepared their Pavement Evaluations and Recommendations report, <br /> which is included in Appendix D, at a not-to-exceed cost of$3,290. <br /> 5.2 Funding <br /> 5.2.1 Assessments <br /> The City's adopted Special Assessments Policy allows special assessments in an amount <br /> not to exceed 25% of eligible street reconstruction project costs to be levied against <br /> benefiting properties. Eligible project costs include costs required to reconstruct the street <br /> at its current width, and to reconstruct the pavement without increasing its structural <br /> capacity. Benefiting properties are considered to be any parcel that has their primary <br /> access onto any of the street segments being reconstructed. A total of 44 benefitting <br /> properties have been identified for this project. The Preliminary Assessment Map and Roll <br /> are included in Appendix C. <br /> The engineer's opinion of probable costs for eligible assessment costs totals $283,000. <br /> Assessable residential parcels are preliminarily proposed to be assessed for 25 percent of <br /> eligible project costs, which totals $70,752 and equals $1,608 per parcel. Assessment <br /> terms are proposed at ten years. Interest rates are proposed at two percent above the bond <br /> interest rate. <br /> The "per lot" method of assessment identified in the City of Ramsey's Special <br /> Assessments Policy is proposed to be used to calculate assessments for this project. <br /> Properties which have their primary access onto one of the reconstructed streets are <br /> proposed to be assessed. <br /> Special assessments have not been utilized widely in recent years for street reconstruction <br /> projects in Ramsey. In addition, State Statute and the City Charter do not allow for <br /> assessments to exceed the benefit to the property. Therefore, Staff may want to ensure <br /> that all assessments applied with this project will not exceed the benefit to assessed <br /> properties and may therefore request Council authorization to order a benefit appraisal <br /> consultation report for this project in accordance with the City's Special Assessments <br /> Policy at the time a construction contract is awarded. <br /> Feasibility Report <br /> Rivers Bend Street Reconstructions <br /> City ofRamsey Project No.I7-02 Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.