My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/11/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 04/11/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:31:41 PM
Creation date
4/10/2017 9:28:31 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/11/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
754
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.2.2 City Contribution <br /> The City contribution to the project will include all funding in excess of the amount <br /> collected through special assessments to benefiting properties which equals 75 percent of <br /> eligible project costs. No funds have been budgeted for this project. <br /> The City's share of eligible project costs related to surface (street) improvements is <br /> proposed to come from the previously encumbered 5-year Street Reconstruction and <br /> Overlay Program bonds. Stormwater Utility Funds are proposed to pay for all storm <br /> sewer improvements. <br /> Special assessments are proposed to pay back a portion of these costs based on the final <br /> assessments adopted by Council at the end of the project. <br /> Table 1 illustrates the proposed project funding based on the proposed design outlined <br /> within this report. This funding program assumes construction will occur in 2018. <br /> TABLE 1 <br /> Proposed Project Funding <br /> ASSESSMENTS CITY FUNDS TOTAL <br /> EstimatedCosts $70,752 $212,248 $283,000 <br /> Total Estimated Project Cost $283,000 <br /> Less Special Assessments (25%) - $70,752 <br /> Subtotal = $212,248 <br /> Less City Bonding Funds - $210,748 <br /> Subtotal = $1,500 <br /> Less Stormwater Utility Funds - $1,500 <br /> Total Remaining Cost = $0 <br /> Feasibility Report <br /> Rivers Bend Street Reconstructions <br /> City ofRamsey Project No.I7-02 Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.