My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/11/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 04/11/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:31:41 PM
Creation date
4/10/2017 9:28:31 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/11/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
754
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pearson Farm Residential Development EAW Draft—March XX,2017 <br /> Approximately 4.4 acres in the northwest part of the site is located within 1,000 feet of Lake Itasca, <br /> which is Minnesota DNR(MN DNR)pubic water 2-11 OP. <br /> Single-family lots will generally range from 50-to 65-feet wide and from 120 to 230 feet deep. <br /> Public streets are expected to be 28 feet wide and located within 60-foot rights-of-ways,except in <br /> two locations,where the right-of-way is proposed to narrow to 50 to allow for more open space. <br /> Trails will connect to neighborhood open spaces and Puma Street NW. Sidewalks will be <br /> constructed on one side of municipal streets. The development will operate under a homeowners' <br /> association. <br /> Development of the project area will involve installation of public and private infrastructure, <br /> including streets,trails,municipal water and sanitary sewer, stormwater systems,electrical lines, and <br /> telephone lines. The project area will be served by City of Ramsey fire and police services and by <br /> the Anoka-Hennepin School District. <br /> It is anticipated that construction of the development will start in summer 2017 and be phased over 5 <br /> to 10 years,depending on market conditions. Construction will generally be phased from the <br /> southeast to the northwest based on the extension of municipal water and sewer,which will be <br /> extended from the intersection of Puma Street NW and Bunker Lake Blvd NW,at the southeastern <br /> edge of the site. The number of phases will be determined by market demand and absorption. <br /> Infrastructure will be installed at the initiation of each construction phase. In most cases, streets, <br /> water main, and sanitary sewer will only be installed to serve the upcoming phase of construction. It <br /> may be necessary to initiate stormwater system construction at the start of each construction phase to <br /> properly treat stormwater and minimize potential effects of stormwater runoff. <br /> c. Project magnitude: <br /> Table 1. Project Magnitude <br /> Characteristic Number of Units <br /> Total Project Acreage 89.44 <br /> Linear project length NA <br /> Number and type of residential units 246 (single-family detached) <br /> Number and type of residential units 98 (multi-family attached) <br /> Commercial building area(square feet) 0 <br /> Industrial building area(square feet) 0 <br /> Institutional building area(square feet) 0 <br /> Other uses—specify(acres) NA <br /> Structure height(s)(feet) 20-35 <br /> d. Explain the project purpose; if the project will be carried out by a governmental unit, explain the need for <br /> the project and idents its beneficiaries. <br /> The purpose of the Pearson Farm Residential Development is to provide a residential development <br /> with a variety of housing types in proximity to transportation corridors and open spaces. The project <br /> will be carried out by a private entity. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.