My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Economic Development Authority - 04/13/2017
Ramsey
>
Public
>
Agendas
>
Economic Development Authority
>
2017
>
Agenda - Economic Development Authority - 04/13/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:14:23 PM
Creation date
4/10/2017 12:34:20 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Economic Development Authority
Document Date
04/13/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
405
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Key points of interest for the Bunker Lake Industrial Park <br /> Past events that have taken place: <br /> Over the course of the last year, PSD has had numerous requests for industrial/warehouse space in <br /> Ramsey. The City of Ramsey has recently changed the land use on a large parcel west of Armstrong <br /> Blvd. In talking with the City, and learning of this re-zoning, we decided to explore the development an <br /> Industrial park on said parcel. <br /> While exploring the feasibility of creating an industrial park, PSD talked with numerous commercial <br /> brokers and industrial building owners and built a proforma based on the feedback which we received. <br /> We also pulled several comps of available buildings and raw land,with that information we made some <br /> assumptions and realized that the project needed some assistance to get it on its feet to become viable. <br /> At the same time, we developed concept drawings, in order to maximize the use of land for both PSD <br /> and the City, we learned we could fit an additional building on the easterly half if an artery road were to <br /> be built to service said building. <br /> The Pat Brama with the City of Ramsey introduced PSD to Mike Altamari, Project Manager for <br /> Hagemann Holdings. Both parties attended a subsequent meeting and entered into a non-binding <br /> Letter Of Intent. During that meeting we established a purchase price of$1.75/sq.ft. and negotiated the <br /> expense of moving a spoil pile. Hagemann Holdings has also agreed they would fund the assessed <br /> portion of all future road improvements necessary to Bunker Lake Blvd. <br /> On March 28, 2017, Matt Kuker, on behalf of PSD, attended a City Council Workshop meeting which Pat <br /> Brama unveiled the project to the City Council. The project was very well received and there was a <br /> consensus to move ahead and send this to the EDA to see if it qualified for assistance. Pat then sent the <br /> EDA application requirements to PSD,which is description is a part of. <br /> Key building elements and factors of the 1st building: <br /> • The building will be Precast concrete building between 58,500 and 61,000 sq. ft., size to be <br /> determined by panel layout by Precast manufacturer. <br /> • The building will have some color variations and raised parapet walls to denote building <br /> entrances. <br /> • The building will have both drive in doors and dock bays to lessen interruptions to tenants in the <br /> future. <br /> • Each bay of the building will have a 400amp service brought in, more capacity can be added <br /> later if needed. <br /> • The building will front Hwy 10 to allow a retail/wholesale user to be able to have visibility. <br /> • Arterial road will serve the first 4 buildings, this will lessen the number of entrances and curb <br /> cuts onto Bunker Lake Blvd. <br /> • Each bay will have commercial rooftop heat and air conditioning. <br />
The URL can be used to link to this page
Your browser does not support the video tag.