My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Economic Development Authority - 04/13/2017
Ramsey
>
Public
>
Agendas
>
Economic Development Authority
>
2017
>
Agenda - Economic Development Authority - 04/13/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:14:23 PM
Creation date
4/10/2017 12:34:20 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Economic Development Authority
Document Date
04/13/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
405
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• A glass curtain wall, or very similar,will be incorporated on the front that faces Hwy 10. <br /> • We will finish the first bay as a model with concrete floor, showroom and bathroom. The <br /> balance of the building will have the earth pad at the correct height with no concrete. By <br /> leaving it open we can incorporate all the tenants' future needs in the initial construction <br /> (drains, bathrooms, isolation pads, and all other in floor items could be installed without saw <br /> cutting the floor). <br /> • The building will be 24' clear height inside,which allows a tenant to maximize storage of <br /> warehouse items. Max height of the outside walls is to be approx 29.5'. <br /> • PSD will work with the City to design tasteful signage along Bunker Lake Blvd. <br /> • Phase I of this project will occupy approx 3 acres of the 45.3 total acres. If the buildings follow <br /> the concept we developed,we envision a total of 7 buildings in the business park. We anticipate <br /> each of these buildings to be approx 60,000 sq. ft.,we can accommodate larger buildings within <br /> the site, if larger buildings are erected the quantity of buildings would be then decreased. <br /> Timeline of this proiect: <br /> We request that this assistance request be fast tracked through the approval process. There are many <br /> items that need to be completed and approved prior to construction. Are looking to have the first <br /> building available ready for permits and obtain a Certificate of Occupancy as soon as possible. <br /> The following are benchmarks that need to be followed in order: <br /> r' EDA authorizes Ehlers to evaluate assistance request <br /> EDA and City Council approve assistance request <br /> r' Hagemann Holding and PSD, LLC close on the 2 parcels <br /> Preliminary Major Plat application to the City and P&Z(more than 3 lots to be created) in <br /> Easterly <br /> Final Major Plat hearing at the City <br /> Remove and place spoil pile as a berm to the west <br /> Met Council WAC/SAC determination <br /> Architectural and Civil plans and specs are developed <br /> Mass grading underway and trees scrubbed <br /> Site infrastructure installed <br /> Footings and pondage work start <br /> Erect wall panels and roof trusses <br /> r' Finish first bay inside <br /> About PSD, LLC: <br /> PSD, LLC started to develop commercial property in Ramsey in 2003. Over the last 14 years we have <br /> developed/constructed/property managed the following buildings: <br /> NAU Country Insurance Company <br /> Ramsey Office Plaza <br />
The URL can be used to link to this page
Your browser does not support the video tag.