Laserfiche WebLink
Mississippi Skyway Preliminary Estimated Project Costs and <br /> Engineering Report Funding Sources <br /> SRF Consulting Group,Inc.was engaged to assess the feasibility A preliminary estimate of project costs has been developed <br /> of constructing a grade separated crossing over THIO and based on the proposed pedestrian bridge options presented in <br /> Riverdale Drive. The study included the following objectives: this report. The preferred bridge concept costs are estimated <br /> at $5.1 million to $5.6 million. These costs are based on 2015 <br /> » Identify potential locations for a new pedestrian bridge crossing ofTH dollars and include a 10% contingency and an estimated 20% <br /> 10 and Riverdale Drive. <br /> » Conduct preliminary analysis of alignments and profiles for further <br /> for engineering and construction administration cost. <br /> consideration in future design phases. In 2014, the National Parks Service (NPS) awarded the City a <br /> » Identify impacts to adjacent private and public lands for possible grant for construction related activity for the Mississippi Skyway <br /> Right-of-Way(ROW)easements and acquisitions. pedestrian bridge. The "MISSISSIPPI RIVER SKYWAY BRIDGE - <br /> » Identify impacts to existing utilities. MISSISSIPPI NATIONAL RIVER AND RECREATION AREA (MISS)" <br /> » Outline potential structure types and aesthetic options for grant provides total program funding of$490,000 with a grant <br /> consideration. availability sun-set date in 2017. <br /> » Provide an outline of future tasks to continue to move the project The City is considering multiple additional funding options and <br /> forward in compliance with anticipated funding requirements. <br /> » Review possible additional site development options for the Partners for the final design considerations, construction, and <br /> surrounding site to facilitate pedestrian and bicycle connections to the maintenance of the proposed pedestrian bridge facility. <br /> approach areas. This report has conservatively assumed the use of typical <br /> Throughout the process, multiple alignments were considered Federal funding sources for purposes of estimating total project <br /> (see Appendix B &Appendix J). With assistance from the City, costs. Note that multiple Federal funding sources are available, <br /> the preferred alignment selected was a straight alignment and each may present a different set of specific project criteria. <br /> from the Ramsey Northstar Station over TH 10 and Riverdale <br /> Drive with a circular helix approach ramp on the south side of Next Steps <br /> Riverdale Drive. <br /> The Mississippi Skyway pedestrian bridge project will likely <br /> Wayfinding and bridge aesthetics were also taken into require a Cooperative Construction Agreement between the <br /> consideration. The proposed bridge aesthetics take their cue City and MnDOT. <br /> from the surrounding civic architecture including City Hall,the <br /> municipal parking ramp, and the Northstar Ramsey Station. An Environmental Review Summary has been prepared (see <br /> Undoubtedly, MnDOT, local stakeholders and the greater Appendix H) to identify existing resources within the vicinity <br /> community will have an interest in the visual quality of the of the Mississippi Skyway project. An environmental review <br /> structure. Further input from stakeholders will help ensure that document will be needed to meet requirements of the National <br /> the bridge will be an attractive and distinctive civic landmark Environmental Policy Act. The type of document will be <br /> that reflects community values. determined when funding is identified based on coordination <br /> with funding partners and federal agencies. The construction <br /> Preferred Pedestrian Bridge Concept D of the bridge is anticipated to be a Categorical Exclusion <br /> (Type II document; no significant environmental impacts are <br /> Seven different structure types were considered as feasible anticipated.) <br /> options for the pedestrian bridge. The City has identified Right-of-Way: Easements and land acquisitions can be <br /> Bridge Concept D in Appendix E as the preferred option,which negotiated at this time and should be prepared to satisfy Federal <br /> includes dual bowstring truss center spans with concrete girder real estate acquisition statutes and regulations. <br /> side spans. Preferred Bridge Concept D is described as follows: <br /> » Visual emphasis is at the center of the bridge at the arcing trusses. Utility coordination may begin with impacted utilities so that <br /> » The new bridge will be distinct from the existing enclosed skyway but utility owners can begin to determine the extent of the impact <br /> will complement its appearance. and the preliminary resolution, whether it be modification or <br /> » Center trusses and vertical piers are the dominant architectural relocation. <br /> features. MnDOT coordination may continue. A MnDOT State/Federal <br /> A center pier is required in the THIO median. Decorative railing Aid project coordinatorwill need to be assigned for determining <br /> enclosure creates an open"experience on the deck without a roof. the State/Federal processes to be followed and for review of <br /> preliminary and final construction documents. <br /> iii I Mississippi Skyway Over TH10 Preliminary Engineering Report December 2014 <br />