Laserfiche WebLink
The draft preliminary bridge plans included in the report may <br /> be advanced to a complete preliminary plan for review and <br /> approval by the MnDOT Bridge Office Preliminary Plan Review <br /> Unit. Upon approval of the preliminary plan, the final design <br /> and plans may be prepared and reviewed per the Cooperative <br /> Construction Agreement Process. <br /> Preparation of funding applications and requests for letters of <br /> support may begin at this time while other steps outlined above <br /> are on-going. <br /> Appendix E,Figure 20-Preferred Concept D View from TH 10 <br /> Appendix E,Figure 19-Preferred Concept D View ofhelix structure from the south <br /> Appendix E,Figure 78-Preferred Concept D Bird's eye view <br /> December 2014 Mississippi Skyway Over TH10 Preliminary Engineering Report iv <br />