My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/25/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 04/25/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:32:02 PM
Creation date
4/25/2017 2:48:22 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/25/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
838
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Observations: <br /> City Staff proposes to prepare plans and specifications for completing the trunk utilities extension improvements <br /> in-house. The timing of this work fits well with staff's current work load and the status of the other projects we are <br /> working on. Staff also proposes to administer the project and to stake and inspect construction. Staff will also be <br /> sure to connect with all property owners along the west end of Bunker Lake Boulevard during development of <br /> plans and specifications to ensure all proposed utility service stubs are properly located to minimize or prevent <br /> future impacts to Bunker Lake Boulevard. <br /> Repairs to the existing temporary street section as a result of the utilities extension work will be evaluated during <br /> development of the plans. Staff recommends using aggregate base as a temporary surfacing since the street is <br /> proposed to be reconstructed to its permanent condition in the fall of 2017 and/or spring of 2018. Costs to repair or <br /> replace the street surfacing are not included in the estimated costs. Staff estimates this cost can be limited to about <br /> $60,000 if a portion of the City's aggregate base stockpile on the future Public Works campus site can be used as <br /> temporary surfacing. Otherwise, costs will be slightly more to repave the surface. <br /> Alternatives: <br /> Alternative 41 —Motion to recommend adopting Resolution 417-04-100 authorizing plans and specifications for <br /> Improvement Project#17-09, Bunker Lake Boulevard Utilities Extension. <br /> Alternative 42—Motion of other. <br /> Funding Source: <br /> All costs required to extend the trunk utilities are proposed to be paid through City sewer and water funds. <br /> Recommendation: <br /> Staff recommends alternative 41 to support current and future development within the Future Business Park area. <br /> Action: <br /> Adopt Resolution#17-04-100 authorizing plans and specifications for Improvement Project#17-09, Bunker Lake <br /> Boulevard Utilities Extension. <br /> Attachments <br /> Resolution <br /> Figure 1 <br /> Future Bus Park Report Mar2017 <br /> Form Review <br /> Inbox Reviewed By Date <br /> Kurt Ulrich Kurt Ulrich 04/20/2017 04:02 PM <br /> Form Started By:Bruce Westby Started On:04/19/2017 02:44 PM <br /> Final Approval Date:04/20/2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.