Laserfiche WebLink
4.8 Right-of-Ways/Easements <br /> It is anticipated that all improvements will occur within existing City right-of-ways and/or <br /> easements,with the possible exception of tying into private driveways and green areas. It is <br /> therefore not anticipated that the City will need to acquire additional permanent right-of-way or <br /> easements for this project. As such, costs for right-of-way or easement acquisitions are not <br /> included in the probable project costs. <br /> City staff will work with private property owners as needed to obtain any required right of <br /> entries. <br /> Feasibility Report <br /> Sunwood Drive Reconstruction <br /> City of Ramsey Project No.I7-00 Page 9 <br />