My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Planning Commission - 08/05/2004
Ramsey
>
Public
>
Minutes
>
Planning Commission
>
2004
>
Minutes - Planning Commission - 08/05/2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 3:57:55 PM
Creation date
9/28/2004 3:12:20 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Planning Commission
Document Date
08/05/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
request to expand the greenhouse operations. After reviewing his future plans for the property, <br />City Staff recommended that Mr. Rowe apply for an amended CUP that would establish a <br />maximum cap to the size of the operation. It is staff's opinion that operating under a building <br />coverage cap is more efficient than processing a CUP every time there is a need to expand some <br />aspect of the greenhouse facility. Since City Code restricts building coverage in the R-1 District <br />to 35°/; of thc lot area, it seemed appropriate to use that rule as a cap to the size of the greenhouse <br />activities. The City Engineering Department has calculated that the greenhouse facility is <br />currently at approximately 25% lot coverage, or 405,584 square feet in size. A cap of 35% <br />would allow up to 167,271 square feet of additional expansions to the facility. <br /> <br />Assistant Community Development Director Trudgeon advised staff also recommended that Mr. <br />Rowe plan for a perimeter buffer yard between his operation and surrounding residential <br />properties. City Code requires a 60 foot wide buffer yard between industrial and residential uses. <br />Mr. Rowe's site plan indicates that he will implement a 65 foot buffer yard around the perimeter <br />of the property. The City Engineering .Department has recommended that' the applicant obtain a <br />pcnnit from the Lower Rum River Water Management Organization to address the ultimate site <br />devclopment. He advised staff recommends approval of the amended conditional use permit. <br />The CUP has been drafted to require that all construction must comply with applicable City <br />codes and the Minnesota State Building Code. The intent of this requirement is to ensure that <br />any buildings housing uses that are subject to the Building Code, would also have to go through <br />the site plan review and approval process at the City. <br /> <br />Chairperson Nixt questioned why a variance was not required in the past for the use that was not <br />pern~itted. <br /> <br />Assistant Community Development Director Trudgeon replied the City apparently determined <br />this was a legal non-conforming use and thought the best way to deal with it was through a <br />conditional use permit. The code previously allowed for uses not permitted under a particular <br />zoning district to be allowed through a conditional use permit. <br /> <br />Chairperson Nixt expressed concern of allowing a blanket expansion to the maximum limits <br />without a review process. <br /> <br />Assistant Community Development Director Trudgeon explained many of the buildings on this <br />site are green houses used for the nursery that in some sense can be considered temporary. <br />Expansions and additional buildings would require a site plan, although the greenhouses would <br />not require a thorough site plan review process. <br /> <br />Chairpcrson Nixt questioned how future expansion will be handled. He stressed the need for the <br />property to come into code compliance at some point with future expansions. <br /> <br />Assistant Community Development Director Trudgeon replied there is serious discussion as to <br />what the calculated storm water management fee would be. One of the purposes is to have the <br />information to better calculate what will be added. Some calculations have been done and staff <br />has a good base line. <br /> <br />Planning Commission/August 5, 2004 <br /> Page 9 of 40 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.