My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/09/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 05/09/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:32:24 PM
Creation date
5/12/2017 3:18:12 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/09/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
524
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. Water Lateral Fees. The PERMITTEE is constructing its own lateral service lines; <br />therefore no water lateral benefit fee is due. <br />7. Stormwater Management Fee. The PERMITTEE is responsible for satisfying <br />applicable Stormwater Trunk Fee requirements. The 2017 Stormwater <br />Management Fee applicable to the Plat is $473 per residential unit. PERMITTEE <br />must pay a Stormwater Management Fee of Twelve Thousand Seven Hundred and <br />Seventy One Dollars and No Cents ($473 x 27 units = $12,771.00). The <br />PERMITTEE acknowledges that these fees are estimates. The rate in effect when <br />the Plat is recorded will be collected. <br />8. Street Light Fee. The PERMITTEE is responsible for a Street Light Fee of One <br />Thousand Four Hundred and Forty One Dollars and No Cents ($1,441.00) per light. <br />The PERMITTEE is responsible for installation of street lights within the Plat. As <br />of February 1, 2017 Connexus Energy no longer creates a street lighting plan for <br />final plats. As such, the PERMITTEE will be required to create a street lighting <br />plan and receive approval of that street lighting plan from the CITY. <br />PERMITTEE acknowledges that the final quantity of street lights required may <br />change pending final approval of the lighting plan by the CITY. The <br />PERMITTEE shall work directly with Connexus Energy for street light <br />installation. <br />9. Street Light Operation and Maintenance Fee. The PERMITTEE is responsible for <br />a Street Light Operation and Maintenance Fee associated with lighting of public <br />rights of way. PERMITTEE must pay a Street Light Operation and Maintenance <br />Fee of Two Hundred and Ninety Four Dollars and No Cents ($294.00) per light. As <br />of February 1, 2017, Connexus energy no longer creates a street lighting plan for <br />final plats. As such, the PERMITTEE will be required to create a street lighting <br />plan and receive approval of that street lighting plan from the CITY. The <br />PERMITTEE acknowledges that these fees are estimates. The rate in effect when <br />the Plat is recorded will be collected. <br />
The URL can be used to link to this page
Your browser does not support the video tag.