Laserfiche WebLink
DATE <br />CITY OF RAMSEY LAND USE APPLICATION <br />TECHNICAL REVIEW FILE <br />MAY 4, PROJECT ADDRESS WEST OF OLIVINE STREET <br />2017 <br />PROJECT. TITLE BROOKFIELD 8TH ADDITION <br />EscRow # 115267 <br />DEPARTMENT: Engineering <br />Name: Leonard Linton <br />TECHNICAL Phone: 763 433-9834 <br />Email: llinton@ci.ramsey.mn.us <br />REVIEWER: <br />AT 168TH CIRCLE <br />The Engineering Depatttnent offers the following comments regarding the Final Plat Exhibits for <br />Brookfield 8th Addition. The submittal consists of 24 sheets prepared by E. G. Rud & Sons, Inc. <br />and Plowe Engineering, Inc. dated September 1, 2016, revised April 12, 2017. <br />NO RECYCLE IN WEAR COURSE <br />Sheet Specific Comments: <br />CO.1 Removals Plan <br />1. The wetland buffer text must be bold to standout on this sheet. <br />C1.1 and C1.2 Plan and Profile Watermain and Sanitary Sewer <br />1. Replace "Ramsey Public Works" with "Ramsey Engineering". Please make this change <br />on all sheets. <br />2. Call out angle of watermain bends. <br />3. Label length of watermain in profile view. <br />4. Verify invert elevation of San MH 5. <br />C 1.3 Plan and Profile Watermain <br />1. Add a match line to the plan view and to sheet C1.2. <br />2. Directional boring pit needs to be outside of wetland. <br />3. Specify where the DIP ends and the HDPE begins. <br />4. Provide detail on connecting DIP to HDPE, 2 locations. <br />5. Move watermain to 10 ft east of forcemain. <br />6. The connection to the existing watermain in 166th Ave. will require a wet tap. Search of <br />the as -built records did not show a Tee was installed at this location. <br />7. Add a hydrant to the new line just north of 166th Ave. <br />