My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/09/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 05/09/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:32:24 PM
Creation date
5/12/2017 3:18:12 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/09/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
524
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DATE <br />CITY OF RAMSEY LAND USE APPLICATION <br />TECHNICAL REVIEW FILE <br />MAY 4, PROJECT ADDRESS WEST OF OLIVINE STREET <br />2017 <br />PROJECT. TITLE BROOKFIELD 8TH ADDITION <br />EscRow # 115267 <br />DEPARTMENT: Engineering <br />Name: Leonard Linton <br />TECHNICAL Phone: 763 433-9834 <br />Email: llinton@ci.ramsey.mn.us <br />REVIEWER: <br />AT 168TH CIRCLE <br />The Engineering Depatttnent offers the following comments regarding the Final Plat Exhibits for <br />Brookfield 8th Addition. The submittal consists of 24 sheets prepared by E. G. Rud & Sons, Inc. <br />and Plowe Engineering, Inc. dated September 1, 2016, revised April 12, 2017. <br />NO RECYCLE IN WEAR COURSE <br />Sheet Specific Comments: <br />CO.1 Removals Plan <br />1. The wetland buffer text must be bold to standout on this sheet. <br />C1.1 and C1.2 Plan and Profile Watermain and Sanitary Sewer <br />1. Replace "Ramsey Public Works" with "Ramsey Engineering". Please make this change <br />on all sheets. <br />2. Call out angle of watermain bends. <br />3. Label length of watermain in profile view. <br />4. Verify invert elevation of San MH 5. <br />C 1.3 Plan and Profile Watermain <br />1. Add a match line to the plan view and to sheet C1.2. <br />2. Directional boring pit needs to be outside of wetland. <br />3. Specify where the DIP ends and the HDPE begins. <br />4. Provide detail on connecting DIP to HDPE, 2 locations. <br />5. Move watermain to 10 ft east of forcemain. <br />6. The connection to the existing watermain in 166th Ave. will require a wet tap. Search of <br />the as -built records did not show a Tee was installed at this location. <br />7. Add a hydrant to the new line just north of 166th Ave. <br />
The URL can be used to link to this page
Your browser does not support the video tag.