Laserfiche WebLink
Review File: Brookfield 8th Addition <br />Final Plat Exhibits <br />Third Engineering Review <br />May 4, 2017 <br />Page 2 of 2 <br />C 1.4 <br />1. Adjust existing profile to reflect shots shown on sheet C3.7. <br />2. The pond outlet profile view does not match the plan view. The plan view states match <br />elevations in the 870 range. The profile view shows the trail at 880. <br />C 2.1 <br />1. Please revise the Trott Brook — TMDL to list the BMPs used on this project and the <br />expected water quality treatment improvements provided by each practice. Provide this <br />information in report form also. <br />C 2.3 <br />1. The wetland buffer text must be bold to standout on this sheet. <br />2. Add note under tree protection "Refer to Oak Wilt management plan dated April 7, 2017". <br />Add this note to C 2.4 also. <br />C 3.7 <br />1. The wetland buffer text must be bold to standout on this sheet. <br />A project manual which includes the bid form, contract and specifications must be submitted with <br />the final plat. <br />Revised plans which address all of these changes must be submitted. <br />