My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 05/04/2017 - Special
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2017
>
Agenda - Planning Commission - 05/04/2017 - Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:28:18 AM
Creation date
5/23/2017 10:36:41 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Title
Special
Document Date
05/04/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix G: Capacity Analysis Backup <br />Generated with umiiimilgi <br />Version 5.00-00 <br />CONSULTING <br />Vistro File: C:\...\Pearson Farm Model.vistro Scenario 4 2040 No -Build AM Peak <br />Report File: C:\...\2040_No-Build AM.pdf 3/7/2017 <br />Intersection Analysis Summary <br />ID Intersection Name Control Type Method Worst Mvmt V/C Delay (s/veh) LOS <br />Puma Street &Bunker Lake 2 Two-way stop HCM 2010 SB Thru 0.000 11.5 B <br />Boulevard <br />3 Alpine Drive & Okapi/Puma Two-way stop HCM 2010 NB Thru 0.000 16.6 C <br />Street <br />V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. for <br />all other control types, they are taken for the whole intersection. <br />Scenario 4: 4 2040 No -Build AM Peak <br />Traffic Impact Study G20 Spack Consulting <br />Pearson Farm Residential Development <br />
The URL can be used to link to this page
Your browser does not support the video tag.