Laserfiche WebLink
Lot width 200 feet <br />Front yard 40 feet <br />setback <br />Side yard <br />setback <br />(uninhabitable) <br />Side yard <br />setback <br />(habitable) <br />Side yard <br />setback for <br />corner lots** <br />Rear yard <br />setback <br />Maximum lot 30% <br />coverage <br />Maximum 35 feet <br />building height <br />(measured <br />from mean <br />ground level to <br />mean gable) <br />* Lot 1 Block 1 shows 57 feet at the front lot line, but it appears that it 'nay meet the minimum <br />standard of 80 feet at the building setback line. <br />** Will apply to Lot 1 Block 1 and Lot 1 Block 2 as the intent of Outlot C is for a future road. <br />Underlying <br />Zoning District <br />80 feet* <br />10 feet <br />10 feet <br />Underlying <br />Zoning District <br />Underlying <br />Zoning District <br />Underlying <br />Zoning District <br />Not Addressed Underlying <br />Zoning District <br />35 feet <br />Underlying <br />Zoning District <br />Underlying <br />Zoning District <br />Underlying <br />Zoning District <br />80 feet <br />(measured at <br />front yard <br />setback) <br />30 feet <br />6 feet <br />10 feet <br />30 feet <br />30 feet <br />35% <br />35 feet <br />40 feet <br />10 feet <br />10 feet <br />Not shown <br />30 feet <br />Not shown <br />Not shown <br />As has been noted already, the development site is located within the 2020 MUSA boundary and <br />thus, is required to be serviced with municipal sewer and water. However, the requested Zoning <br />Amendment to designate the site as a PUD is a legal zoning tool that allows for the deviation to <br />utilize private utilities (if approved by City Council). <br />The only potential deficiency to the above table is lot width for Lot 1 Block 1 and Lot 11 Block 2. <br />It appears that at the building setback line there is sufficient width to comply with this standard. <br />Action Item: Include the lot width measurement at the front yard setback for Lot 1 Block 1 and <br />Lot 11 Block 2. <br />\AI E: 4 <br />a Inn : " a Inn <br />it In s <br />The project site does not appear to contain any floodplain areas or wetlands. <br />It is our mission to <br />to responsibly <br />ithenatcne Ad <br />rervr our ccmmunity and to provide quality, cco, <br />ion Planning Division Review March 31 2017 (Sketch Plan) <br />Pam 3 of4 <br />ectiroe and el%sent government services. <br />