Laserfiche WebLink
Summary of Requests from PSD to the City <br />1: Mass Site Preparation Improvements <br />(master business park developer) <br />(A) City funding of Internal Public Roadway: 200-250K <br />[4.7% to 5.9% of total, $4.24M] <br />2: 60,000 SF Spec Industrial Building <br />(individual project) <br />(B) City funding to stabilize speculative building: 9 yr TIF, 277K PV <br />[5.0% of total, $5.49M] <br />