Final S itc Plan Review - Gateway Retail Building Town Center 3rd Addition <br />October 7, 2004 <br />Page 3 of 8 <br /> <br />Sheet Specific Comments <br /> Page 25, 26 Show more spot elevations along Sunwood Drive. <br /> Page 26 Check spot elevations. Provide spot elevation at CBMH 19. <br />· Page 30 Typical sections through walls are not referenced on plans. <br /> Railing must be shown on the top of section 3. <br /> Signed engineering plans are required for all retaining walls. <br /> Page 66 Revise spot elevation locations to match curb locations. <br /> <br />Utility Phm. We offer the tbllowing comments:' The italicized comments were <br />July 2004 review and have not been addressed inthe current plans. <br /> <br />issued in the <br /> <br />· Please submit exhibits showing the landscaping superimposed on the utility plan. <br />· Please submit 8 %_ x 11 detail sheets at a scale of 1'? = 4' or less for areas where pipe <br /> conflicts may exist, ie. watermain in close proximity to sanitary or storm sewer <br /> structures, pipes at same elevation, hydrants in islands near other pipes. Minimum <br /> horizontal separation between hydrant barrel and storm pipes is 18". <br />· Coordinate with the MSA plans to remove the sanitary sewer and water service along <br /> Armstrong Boulevard west of the pond. <br />· The proposed watermain layout is being reviewed by the city consultant to verify <br /> adequaoy of hydrant flows. This information may not be available before this review <br /> letter is sent. The results of the review will be sent to UPS. <br />· Thefire inspector is reviewing the hydrant layout for coverage of the site. Comments <br /> will'be provided during the review process. The parking stall in front of a hydrant <br /> located behind the curb must be signed "No Parking" and the stall marked with paint. <br />· 7'he storm water plan approved with the final plat of Ramsey Town Center is being <br /> modified to allow more room for development on this site. Meetings have been held <br /> to resolve the changes. The changes included making the southwest pond smaller, <br /> increasing the size of other ponds and changing pipe sizes and alignments. Details to <br /> be resolved include verifying that there is adequate clearance between the pipes after <br /> the change in size, verifying the clearance around the new manholes and verifying <br /> cover over the pipe. These issues were discussed at a meeting held July 1, 2004 and <br /> work was to start on checking these specific issues. <br />· The regional pipe that the pond outlet connects to must be installed and operational <br /> prior to release of certificates of occupancy. <br />· Detail of the connection between the retaining walls and the storm sewer pipes <br /> draining to the pond is not provided. Submit construction detail for these elements. <br /> <br />Sheet Specific Comments-' <br />· All utility pages - Continuation references are not correct. Review and revise all <br /> affected sheets. <br />· Show all crossing pipes in profile vie,vs. <br /> <br /> <br />