Finance Officer Lund replied the cost is the same, what is different is that both the trunk and the <br />WAC were not totally complete on the schedule. Also, the ending balance at this time would go <br />down to two million dollars, in which it had not gone lower than four million dollars. Staff is <br />proposing to have a 50 percent year operating expense, which goes into effect by 2014. By the <br />time that comes into play they should have a very good knowledge of what is happening with <br />trunk and WAC charges. <br /> <br />Assistant Public Works Director Olson explained when the suggested trunk charges were <br />compared to other cities they were shockingly high. The rates were within the range, but closest <br />to thc highest. <br /> <br />Bob Brown of Bolton & Menk explained as they prepared both the comprehensive sewer and <br />water system, there was a lot of information and data. He apologizes for probably not being as <br />concise on the financial rates. There were ranges for the sewer and assumptions for the water <br />system that should have been clearer. He indicated the Committee's packet includes a handout <br />that summarizes the original plan and the revised recommendations. There are also comparisons <br />of surrounding cities that are for SAC, WAC and total charges. <br /> <br />Dave Martini of Bolton & Menk stated when they discussed the comprehensive plan he was not <br />clear on the fees and did not go into enough detail. The comprehensive sanitary sewer report <br />talks about tees, and they had laid out the trunk system on the map that showed how the system <br />could be expanded in the future. With the estimated total cost of the improvements of about 27 <br />million dollars, the City's current charge of $596 per connection fell short of the needed funds to <br />expand that system. The figure of $1,800 per unit was calculated to reach the 27 million dollars. <br /> <br />Chairperson Elvig questioned how the 27 million dollars was determined, as he thought the cost <br />of the main trunk was closer to 12 million dollars. <br /> <br />Mr. Martini explained the 27 million dollars was basically everything that was shown on the map <br />in the report, which includes the lift stations and all the lines on the map. They went on to say in <br />the report that this amount is somewhat deceiving because when the system is expanded <br />developers wonld be responsible for 8-inch lines in developments, rather than the City. When <br />subtracting out the 8-inch lines they come up with a number of 16 million dollars. This equates <br />to $1,100 per connection. That is where the confusion came in. Both of these numbers were <br />presented, where in reality the $1,100 number equates more to the City's actual cost of <br />expanding the system. He explained this way of charging matches the way the City has been <br />financing these projects in the past. <br /> <br />Mr. Brown advised he recommends that the rate increase start in January 2005 for the increase of <br />the trunk charge, as well as the increase in the SAC charges from $596 to $1,100. <br /> <br />Councihnember Strommen requested clarification that this would be a one-time increase, rather <br />thau incremental. <br /> <br />Finance Committee/September 28, 2004 <br /> Page 2 of 7 <br /> <br /> <br />