My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/26/2004 - 10/26/04
Ramsey
>
Public
>
Agendas
>
Council
>
2004
>
Agenda - Council - 10/26/2004 - 10/26/04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 2:33:07 PM
Creation date
10/22/2004 11:36:36 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Title
10/26/04
Document Date
10/26/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PAY ESTIMATE NO. 5 OWNER <br />SUNWOOD DRIVE N.W. AND RHINESTONE STREET NW <br /> <br />Bid Schedule "A" - S.A.I'. 199-104-07 - Sunwood Drive NW Continued <br /> <br />ITEM CONTRACT USED TO- <br /> ITEM QTY UNIT UNIT COST EXTENSION <br />NO. AMOUNT DATE <br />60 F & [ Sign l'anel Type "D" 7 EACH $258.00 $1,806.~)0 $0.00 <br />61 !TYPE Ill BARRIDADE I I EACH $309.60 $3,405.60 $0.00 <br /> <br /> 62 PAVEMENT MESSAGE (ONLY) POLY PREFORMED 32 EACH $387.00 $12,384.00 $0.00 <br /> 63 PAVEMENT MESSAGE (KR CROSSING) PAINT 2 EACH $159.96 $319.92 $0.130 <br /> 64 PAVEMENT MESSAGE (COMBINATION ARROW)PAINT 4 EACH $82.56 $330.24 $0.00 <br /> 65 ~PAVEMENT MESSAGE (RIGHT ARROW) POLY PREFORMED 12 EACH $309.60 $3,715.20 $0.00 <br /> 66 PAVEMENT MESSAGE (LEFT AI~.ROW) POLY PREFORMED 28 EACH $309.60 $8,668.80 $0.00 <br /> 67 4" BROKEN LINE YELLOW EPOXY 200 LF $0.51 . $102.00 $0.00 <br /> 68 4" SOLID LINE WHITE - EPOXY 12500 LF $0.50 $6,250.00 $0.001 <br /> 69 4" BROKEN LINE WHITE - EPOXY 3150 LF $0.50 $1,575.00 $0.00 <br /> 70 24" STOP LINE WII[TE - EPOXY 800 LF $7.22 $5,776.00 $0.00 <br /> 71 136" SOL1D 1,IN1:, WHITE - EPOXY · 1100 LF $8.67 $9,537.00 $0.00 <br /> 72 4" DOIJB[,E SOl,ID LINE YELLOW - EPOXY 7350 LF $1.01 $7,423.50 $0.00 <br /> 73 24" SOLID LINE YELl,OW - EPOXY 1670 LF $5.68 $9,485.60 $0.00 <br /> 74 4" SOLID LINE WHITE - PAINT 3000 LF $0.41 $1,230.00 $0.00 <br /> 75 4" DOUBLE SOl,ID [,1NE YELLOW - PAINT 2300 LF $0.83 $1,909.00 $0.00 <br /> 76 24" SOLID LINE YE[,[,OW - PAINT 330 LF $2.58 $851.40 $0.00 <br /> 77 .NMC LOOP DETECTOR 6' X 6' 43 EACH $485.04 $20,856.72 24 $11,640.96 <br /> 78 PVC IIANDHOLE (METAl, FRAME AND COVER) 23 EACH $567.60 $13,054.80 13 $7.378.80 <br /> 79 INSTALL 4"-6" PVC (SC,'[ 40) CONDUIT 2400 LF $6.45 $15,480.00 2400 $15,480.00 <br /> 80 IF & [ 4" RIGID STF, EI, CONDUIT 430 LF $25.18 $10,827.40 430 $10,827.40 <br /> 81 BALE CllECK 200 EACH $11.87 $2,374.00 $0.00 <br /> 82 SILT FENCE TYPEMAClllNE SLICED 1000 LF $1.81 $1,810.00 $0.00 <br /> 83 TEMPOILA. RY CONSTRUCTION [I. OCK ENTRANCE 2 EACH $2,412.51 $4,825.02 $0.00 <br /> 84 SEEDING 3.0 ACRE $258.00 $774.00 $0.00 <br /> 85 SODDING. '['YPE I,AWN 5000 SY $2.48 $12,400.00 $0.00 <br /> 86 SEED MIXTURE 260 300 LB $2.63 $789.00 $0.00 <br /> 87 MULCH MATERIAL TYPE 3 6 TON $154.80 $928.80 $0.00 <br /> 88 EROSION CONTROL BLANKETS CATEGORY 3 100 SY $1.55 $155.00 $0.00 <br /> 89 COMMERCIAl, FF~RT[I JZEP, ANALYSIS 24-2-24 1200 LBS $0.36 $432.00 $0.00 <br /> <br />Total Bid Sche(lule "..\" <br /> <br />$1,951,654.92 $608,289.69 <br /> <br />3171/ra3171pe.xlsPAY ESTIMATE NfO. 5 PE-3 Rev. 4/14/04 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.