PAY' ESTIMATE NO. 5 OWNER
<br />SUNWOOD DRIVE N.W. AND RHINESTONE STREET NW
<br />
<br />Bid Schedule "A" - S.A.I'. 199-104-07 - Sunwood Drive NW Continued
<br />
<br />ITEM CONTRACT USED TO-
<br /> ITEM QTY UNIT UNIT COST EXTENSION
<br />NO. AMOUNT DATE
<br />29 73" SPAN RC P[I'E - ARCIt CL IIA 181 LF $134.11 $24,273.91 442 $59,276.62
<br />30 72" RC P1PF~ SEWER DESIGN 3006, CL3 148 LF $162.26 $24,014.48 252 $40,889.52
<br />31 88' SPAN RC PIP['; - ARCH Cl, IIA 16 LF $179.36 $2,869.76 $0.00
<br />32 18" PVC PLUG I EACH $110.00 $110.00 $0.00
<br />33 } 5" PIPE PI,UG I EACH $80.00 $80.00 .1 $80.00
<br />34 [8" PIPE PI,UG 3 EACH $35.00 $105.00 3 $105.00
<br />35 21" PIPE PI.UG 2 EACH $40.00 $80.00 1 $40.00
<br />36 27" PiPE PLUG 2 EACH $50.00 $100.00 2 $100.00
<br />37 44" SPAN ARCII PiPE PI,UG I EACH $150.00 $150.00 $0.00
<br />
<br /> 38 42" PIPE PLUG 2 EACH $100.00 $200.00 .1 $100.00
<br /> 39 60" PIPE PLIJG I EACH $200.00 $200.00 $0.00
<br /> 40 73" SPAN ARCH PIPE PI,UG 2 EACH $350.00 $700.00 $0.00
<br />
<br /> 41 72" PIPE PLUG 2 EACH $300.00 $60000 2 $~00.00
<br /> 42 88" SPAN AR.C[[ lqI'L" Pt,UG I EACH $400.00 $400.0£ $0.00,
<br /> 43 CONSTRUCT DRAINAGE STRUCTURE DESIGN 48 - 4020 108 LF $162.69 $17,570.52 85.1 $13,844.92
<br /> 44 CONSTRUCT DP, AINAGE STRUCT[JRE DESIGN 54 - 4020 32 LF $205.91 $6,589.12i 2'1 $4,324.1 '1
<br /> 45 CONSTRUCT DRAINAGE STRUCTURE DESIGN 60 - 4020 19 LF $274.42 $5,213.9~ 24 $~,58~.08
<br />
<br /> 46 CONSTRUCT DRAINAGE STRUCTURE DESIGN 72 - 4020 13 LF $320.28 $4,163.64 '1 '1 $3,523.08
<br />
<br /> 47 CONSTRUCT DRAINAGE STRUCTURE DESIGN 84 - 4020 12 LF $470.83 $5,649.96 '10 $4,708.30
<br /> 48 CONSTRUCT DP, AINAGI'; STRUCTURE DESIGN 90 - 4020 5 LF $648.12 $3,240.60: 4 $2,592.48
<br /> 49 CONSTP, UCT DP, AINAGF, STRUCTURE DESIGN 96 - 4020 13 LF $598.38 $7,778.941 10.9 $~,522.34
<br /> 50 CONSTRUCT DRA1NAGE STRUCTUI'LE DESIGN I08 - 4020 50 LF $728.15 $36,407.50 45.9 $33,422.09
<br /> 51 CONSTRIJCrl' DRAINAGE STRUCT[JRE DESIGN 120 - 4020 20 LF $1,032.36 $20,647.20 17.4 $~7,9~3.06
<br /> 52 CASTING ASSEMP, LIES SPECIAL 49 EACH $479.25 $23,483.25, 8 $3,834.00
<br /> 53 CASTING ASSEMBLIES A-7D 4 EACH $546.13 $2,184.52 $0.00
<br /> 54 CAS'I'ING ASSEMItLIES M-II 2 EACH $564.45 $1,128.90 $0.00
<br /> 55 CONSTRUCT I)RAINAGE STRUCTURE DESIGN SPECIAL I 12 EACH $376.58 $4,518.96 10 $3,7135.80
<br /> 56 CONCRETE CURIl AND GUTTER DESIGN B424 1040 LF $8.88 $9,235.20 '1040 $9,235.20
<br /> 57 SIGN PANELS TYPE C 316 SF $22.19 $7,012.04 $0.00
<br /> 58 CONCRETE CUI~.B AND GU'FTER DESIGN B618 4700 LF $7.59 $35,673.00 2371 $17,995.89
<br /> 59 PEDESTP, IAN CUP, B RAMP 2 EACH $319.92 $639.84 $0.00
<br />
<br />G:lSharedDocslMunicipal/ARamseyl
<br />3171/ra3171pe.xlsPAY ESTIMATE NO. 5 PE-2 Rev. 4/14/04
<br />
<br />
<br />
|