My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/26/2004 - 10/26/04
Ramsey
>
Public
>
Agendas
>
Council
>
2004
>
Agenda - Council - 10/26/2004 - 10/26/04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 2:33:07 PM
Creation date
10/22/2004 11:36:36 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Title
10/26/04
Document Date
10/26/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PAY ESTIMATE NO. 5 OWNER <br />SUNWOOD DRIVE N.W. AND RHINESTONE STREET NW <br /> <br />Bid Schedule "C" - S,A.P. 199-109-01 - Rhinestone Street ,'N'W Continued <br /> <br />ITEM ITEM QTY UNIT UNIT COST CONTRACT USED TO- <br />NO. AMOUNT DATE EXTENSION <br />213 CONSTRUCT DP, Y~INAGE STRUCTURE DESIGN 4.8 - 4020 49 LF $144.55 $7,082.95 3t.9 $4,611.15 <br />214 CONSTRUCT DRAINAGE STRUCTURE DESIGN 54 - 4020 11 LF $202.58 $2,:~28.38 9.1 $1,843.48 <br />215 CONSTRUCT DRAINAGE STRUCTURE DESIGN 60 - 4020 10 LF $240.94 $2,409.40 8.6 $2,072.08 <br />216 CONSTRUCT DRAINAGE STRIJCTURE DESIGN 66 - 4020 8 LF $284.46 $2,275.68 12.7 ~3,612.64 <br />217 CONSTRUCT D[LAINAGE STRUCTURE DESIGN 72 - 4020 12 LE $355.03 $4,260.36 9.8 $3,479.29 <br />218 CONSTRUCT DRAINAGE STRU'CTURE DESIGN 78 - 4020 19 LF $354.94 $6,743.86 13.9 $4,933.67 <br />219 CONSTRUCT DRAINAGE STRUCTURE DESIGN 84 - 4020 7 LF $456.75 $3,197.25 17.3 $7,901.78 <br />220 CONSTRUCT DRAINAGE STRUCTUILE DESIGN 96 - 4020 40 LF $544.76 $21,790.40 15.6 $8,498.26 <br />221 CASTING ASSEMBLIES SPECIAL 30 EACH $479.25 $14,377.50 9 $4,3'13.25 <br />222 CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL [ 6 EACH $376.58 $2,259.48 3 $1,129.74 <br />223 4" CONCRETE WALK 23000 SF $2.01 $46,230.00 $0.00 <br />224 6" CONCRETE WALK 2500 SF $4.33 $10,825.00 $0.00 <br />225 CONCRETECUPd3 AND GUTTER DESIGN B618 2430 LF $7.59 $18,443.70 1550 $11,764.50 <br />226 PEDESTRIAN CURB RAMP 24 EACH $319.92 $7,678.08 $0.00 <br />227 SIGN PANELS TYPE C 188.5 SF $22.19 $4,1.82.82 $0.00 <br />228 PAVEMENT MESSAGE (ONLY) EPOXY 4 EACH $200.00 $800.00 $0.00 <br />229 PAVEMENT MESSAGE (RIGItT ARROW) EPOXY 3 EACH $144.48 $433.44 $0.00 <br />230 PAVEMENT MESSAGE (LEFT ARROW) EPOXY 5 EACH $144.48 $722.40 $0.00 <br />231 F & [ SIGN ['ANELS TYPE "D" 3 EACH $258.00 $774.00 $0.0( <br />232 4" SOLID LINE ~tltlTE - PAINT 1850 LF $0.41 $758.513 $0.00 <br />233 24" SOLID LINE WHITE- PAINT 20 LF $3.87 $77.413 $0.00 <br />234 36" SOLID LINE WHITE - PAINT 50 LF $5.68 $284.0cl $0.00 <br />235 4" I3ROKEN LiNE YELLOW - PAINT 150 LF $0.42 ' $63.0C $0.00 <br />236 4" DOUBI.E SOLID LINE YELLOW - PAINT 1150 LF $0.85 $977.5C $0.00 <br />237 24" SOLID LINE YI'~LLOW - PAINT 180 LF $2.58 $464.4( $0.00 <br />238 4" SOLID LINE WfIITE - EPOXY 4100 LF $0.50 $2,050.0( $0.00 <br />239 24" STOP LINEWt[ITE- EPOXY 300 LF $7.22 $2,166.ool $0.00 <br />240 36" SOLID LINE WH'[TE - EPOXY 570 LF $8.67 $4,941.90 $0.00 <br />241 4" BROKEN IJNE YELLOW - EPOXY 1800 LF $0.51 $918.00 $0.00 <br />242 4" DOUBLE SOLID LINE YELLOW - EPOXY 600. LF $1.01 $606.00 $0.00 <br />243 24" SOLID LINE YELLOW - EPOXY 50 LF $5.68 $284.00 ' $0.00 <br /> <br /> 244 INSTALL 4"-6" PVC (SCH 40) CONDUIT 1000 LF $6.45 $6,450.00 ' 200 $I ,290.00 <br /> <br />G:lSharedDocslMunicipallARamseyl <br />3171/ra3171pe.xlsPAY ESTIMATE NO. 5 PE-~ Rev. 4/-14/04 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.