My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/26/2004 - 10/26/04
Ramsey
>
Public
>
Agendas
>
Council
>
2004
>
Agenda - Council - 10/26/2004 - 10/26/04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 2:33:07 PM
Creation date
10/22/2004 11:36:36 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Title
10/26/04
Document Date
10/26/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PAY ESTIMATE NO. 5 OWNER <br />SUNWOOD DRIVE N.W. AND RHINESTONE STREET NW <br /> <br />Bid Schedule "C" - S.A.I'. 199-109-01 - Rhinestone Street NW Continued <br /> <br />ITEM coNTRACT USED TO- <br /> ITEM QTY UNIT UNIT COST EXTENSION <br />NO. AMOUNT DATE <br />245 BALE CItECK 50 EACH $11.87 $593.50, <br /> <br /> 246 SILT FENCE TY['E MACHINE SLICED 300 LF '$1.81 $543.0C $0.00 <br /> <br /> 247 TEMPORARY CONSTRUCTION ROCK ENTRANCE I EACH $2,412.51 $2,412.51, $0.00, <br /> 248 SEEDING 1.3 ACRE $258.00 $335.4C $0.001 <br /> 249 SODDING, TYPE LAWN 3700 SY $2.48 $9,176.0( $0.061 <br /> 250 SEED MIXTURE 26[) 130 LB $2.63 $341.9[ $0.00I <br /> 251 MULCH MATER[AL TYPE 3 2.6 TON $154.80 $402.4~ $0.001 <br /> 252 EROSION CONTROL BLANKETS CATEGORY 3 100 SY $2.32 $232.00 $0.00 <br /> 253 COMMERCIAL FEI~.TILIZER ANALYSIS 24-2-24 520 LBS $0.3(5 ' $187.2£ $0.00 <br /> <br />Total Bid Schedule "C" $600,056.05 $154,782.01 <br /> <br />Bid Schedtde "D" - Rhinestoae Street NW Local Funding <br /> <br />ITEM CONTRACT USED TO- <br />N(). ITEM QTY UNIT UNIT COST AMOUNT DATE EXTENSION <br />254 REMOVE I.IITUMINOUS F'AVEMENT 100 SY $5.72 $572.0C 191 $1,092.52 <br />255 SAWING BITIJIvlINOIJS PAVEIvIENT (FULl, DEPTH) 400 LF $0.93 $372.0~ 860 $799.80 <br />256 COMMON EXCAVATION, EV 200 CY $3.20 $640.001 $0.00' <br />257 SALVAGED TO['SOIL FROM STOCKPILE, SV 100 CY $6.60 $660.0( $0.00 <br />258 AGGREGATE BASE CI,ASS 5 MODIFIED 100 TON $9.79 $979.00 $0.00 <br />259 TYPE MV3 WEARING COURSE MIXTURE 50 TON $37.00 $1,850.00 $0.00 <br />260 15" RC SAFETY APRON 2 EACH $487.34 $974.68 $0.00 <br />261 4" DUCTILE IRON PIPE CLASS 53 200 LF $11.35 $2,270.00: 189 $2,145.15 <br />262 6" DUCT[I,E [RUN PIPE CLASS 53 100 LF $11.73 $1,173.00 66 $774.18 <br />263 8" DUCTII,E IRON PIPE CLASS 52 640 LF $14.73 $9,427.20 502 $7,394.46 <br />264 12" DiJCTILF, IRON PIPE CLASS 52 2700 LF $21.77 $58,779.00 2400 $52,248.00 <br />265 8" SDR 26 PVC PIPE (t0-12') 120 LF $9.33 $1,119.60 230 $2,145.~0 <br />266 8" SDR. 26 PVC I'1I'E(12-14') 95 LF $9.68 $919.60 95 $919.60 <br />267 8" SI)I{ 26 PVC I'II'E (14-16') 40 LF $10.52 $420.80 40 $420.80 <br />268 12" SDR 26 PVC PWE 110-12') 40l LF $14.10 $5,654.10 40[ $5,654.10 <br />269 12" SDR 26 PVC PIPE 112-14') 55 LF $14.46 $795.30 $0.00 <br />270 21" SDR26 PVC PIPF,(IO-12') 240 LF $55.36 $13,286.40 217 $12,013.12 <br />271 21" SDR 26 PVC P1PE (12-14') 760 LF $55.81 $42,415.60 760 $42,41§,60 <br /> <br />G lghareODocslMunlclpallARamseyl <br />3171/ra3171pe.xlsPAY ESTIMATE NO 5 <br /> <br />PE-9 Rev. 4/14/04 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.