My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 06/20/2017
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2017
>
Agenda - Public Works Committee - 06/20/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:08:07 AM
Creation date
6/16/2017 10:23:56 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
06/20/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A.W.W.A <br />.: The American Water Works Association. All references to A.W.W.A. specifications shall <br />be understood to refer to their latest published edition. <br /> <br />MnDOT <br />: The Minnesota Department of Transportation. All references to MnDOT specifications shall <br />be understood to refer to their latest published edition. <br /> <br />M.S.S <br />.: Minnesota State Statutes. All references to M.S.S. shall be understood to refer to the latest <br />published edition. <br /> <br />ARTICLE 2. Progress and Submission Schedule; Pre-Construction Conference; Time of <br />Starting Work <br /> <br />2.1 Within 10 Calendar Days after execution of this Agreement, the Contractor shall prepare and <br />submit to the Engineer for review an estimated progress schedule indicating the starting and completion <br />dates of the various stages of the Work and a schedule of Shop Drawing submissions. <br /> <br />2.2 Before starting the Work, a conference will be held to review the above schedules, to establish <br />procedures for handling Shop Drawings and other submissions and to establish a working <br />understanding between the parties as to the Project. Present at the conference will be the Engineer, <br />Project Representative, the Contractor, his superintendent, the Owner and any others who may have an <br />interest in the Project. <br /> <br />2.3 Prior to starting the Work, the Contractor will furnish the Engineer certificates of insurance as <br />required by the appropriate provisions of the Contract Documents. <br /> <br />2.4 The Work contemplated hereunder shall be commenced within ten (10) Calendar Days after <br />receipt by the Contractor of written Notice to Proceed from the Engineer and shall be completed within <br />the time limits set forth in the Special Provisions or as specified elsewhere in the Contract Documents. <br /> <br />2.5 If the Contractor is delayed in the performance of the Work by any neglect of Owner or <br />Engineer, or by an employee, agent or representative of either, or by changes ordered in the Work, or <br />by the combined action of workmen (either those employed on the Work or in any industry essential to <br />the conduct of the Work) in no way caused by or resulting from the default or collusion on the part of <br />the Contractor, or by strikes, lockouts, embargoes, fire, unavoidable casualties, unusual delays in <br />transportation, national emergency, or by any other causes which Contractor could not reasonably <br />control or circumvent, the scheduled completion date and interim completion dates shall be extended <br />for a period equal to the length of such delay if within five Calendar Days after expiration of any such <br />delay Contractor delivers to Engineer a written request for extension for such delay, and such request <br />is approved by the Owner or Engineer, which approval shall not be unreasonably withheld by Owner <br />or Engineer. In case of a continuing cause of delay of a particular nature, Contractor shall be required <br />to make only one such request with respect thereto. Extension of time shall be the Contractor's sole <br />remedy for any such delay (except for Contractor's right to terminate this Agreement pursuant to the <br />provisions of Article 43 hereinafter), unless the same shall be caused by acts constituting intentional <br />interference by the Owner or Engineer with Contractor's performance of the Work and where to the <br />extent that such acts continue after Contractor's notice to Owner or Engineer of such interference. <br />Owner' s or Engineer's exercise of any of its rights under Article 20, Changes in the Work, regardless <br />GC 5 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.