My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 06/20/2017
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2017
>
Agenda - Public Works Committee - 06/20/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:08:07 AM
Creation date
6/16/2017 10:23:56 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
06/20/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
prior to such commencement, either 1) submit an acceptable substitute without an increase in his <br />Contract Price or 2) withdraw his bid and forfeit his bid security. If, after the commencement of the <br />Work, the Owner or the Engineer refuses to accept any Subcontractor, person or organization on such <br />list, the Contractor will submit an acceptable substitute and the Contract Price shall be increased or <br />decreased by the difference in cost occasioned by such substitution and an appropriate Change Order <br />shall be issued; however, no such increase in the Contract Price shall be allowed in respect of any <br />substitution unless the Contractor has acted promptly and reasonably in submitting a name with respect <br />thereto prior to the execution of the Work. <br /> <br />7.6 The Contractor will not employ any Subcontractor (whether initially or as a substitute) against <br />whom the Owner or the Engineer may have reasonable objection, nor will the Contractor be required <br />to employ any Subcontractor against whom the Contractor has reasonable objection. The Contractor <br />will not make any substitution for any Subcontractor who has been accepted by the Owner and the <br />Engineer, unless the Engineer determines that there is good cause for doing so. <br /> <br />7.7 The Contractor will be fully responsible for all acts and omissions of his Subcontractors and of <br />persons directly employed by them and of persons for whose acts any of them may be liable to the same <br />extent that the Contractor is responsible for the acts and omissions of persons directly employed by the <br />Contractor. Nothing in the Contract Documents shall create any contractual relationship between any <br />Subcontractor and the Owner or the Engineer or any obligation on the part of the Owner. <br /> <br />7.8 The divisions and sections of the Specifications and the identifications of any Plans shall not <br />control the Contractor in dividing the Work among Subcontractors or delineating the Work to be <br />performed by any trade. <br /> <br />7.9 The Contractor agrees to specifically bind every Subcontractor to all of the applicable terms <br />and conditions of the Contract Documents. Every Subcontractor, by undertaking to perform any of the <br />Work, will thereby automatically be deemed to be bound by such terms and conditions. <br /> <br />7.10 All Work performed for the Contractor by a Subcontractor shall be pursuant to an appropriate <br />agreement between the Contractor and the Subcontractor which shall contain provisions that waive all <br />rights the contracting parties may have against one another for damages caused by fire or other perils <br />covered by insurance provided in accordance with Contract Documents. The Contractor shall upon <br />request from the Engineer provide copies of the written subcontract agreements to the Engineer. The <br />Contractor will pay each Subcontractor a just share of any insurance monies received by the Contractor. <br /> <br /> <br /> <br />ARTICLE 8: Materials, Equipment and Labor; Substitute Material or Equipment <br /> <br />8.1 The Contractor will provide and pay for all materials, equipment, labor, transportation, <br />construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water and <br />sanitary facilities and all other facilities and incidentals necessary for the execution, testing, initial <br />operation and completion of the Work. <br /> <br />GC 9 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.