Laserfiche WebLink
CITY SPECIAL PROVISIONS <br /> <br />1.General <br />These Special Provisions contain items of specific instruction and subject matter concerning <br />construction detail and/or are modifications to the General Conditions and Standard Specifications. <br />The Contractor shall conduct his work in conformance with the specifications set forth herein and <br />in accordance with the Minnesota Department of Transportation Standard Specifications for <br />Construction, 2016 Edition, which is incorporated by reference to these specifications, and also in <br />accordance with the Standard Utility Specifications prepared by the City Engineers Association of <br />Minnesota (CEAM). <br /> <br /> <br />2.Project Schedule <br />The City of Ramsey anticipates, but does not guarantee award of this project on July 25, 2017. <br />Construction is anticipated to commence on or about August 7, 2017. <br /> <br /> <br />3.Time for Completion and Liquidated Damages <br />The Contractor shall complete the work on or before August 25, 2017. Failure to complete the <br />project within this specified time shall result in the payment as liquidated damages according to <br />the schedule contained in Table 1807-1 of the Minnesota Department of Transportation Standard <br />Specifications for Construction, 2016 Edition. <br /> <br /> <br />4.Working Hours <br />The work shall be carried out during normal daylight working hours in accordance with local <br />ordinance and so as not to cause any unreasonable nuisance to affected residents. Under <br />emergency conditions, this limitation may be waived in writing by the Engineer in conjunction <br />with qualified local authority. Normal working hours in the City of Ramsey are considered to be <br />from 7:00 a.m. to 10:00 p.m. on Monday through Saturday. The contractor shall provide 72 hour <br />advance notice before working on Saturday. City Council approval is required for Sunday work. <br /> <br /> <br />5.Maintenance of Traffic <br />All traffic control devices shall conform and be installed in accordance to: <br /> <br /> <br /> <br /> <br /> <br />The Speed Limits in Work Zones Guideline; <br /> <br />The Minnesota Flagging Handbook; <br /> <br />The Minnesota Standard Signs Manual; <br />SP 1 <br /> <br /> <br />