My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 06/20/2017
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2017
>
Agenda - Public Works Committee - 06/20/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:08:07 AM
Creation date
6/16/2017 10:23:56 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
06/20/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />16.Basis of Payment <br />Payment shall be made for the work on the basis specified below. The cost of any additional labor <br />materials, tool and supplies which have not been specifically identified in this section for payment, <br />but required to complete the project as per the plans and specifications shall be considered <br />incidental to the project. <br /> <br />1.Mobilization Payment shall be made on a lump sum basis for the mobilization of equipment. <br /> <br /> <br />2.Traffic Control Payment shall be made on a lump sum basis as compensation for all <br />equipment, material and labor costs required for the installation and maintenance of traffic <br />control measures (signage, barricades, flasher, etc.), as directed by the Engineer, for any local <br />traffic disruptions or temporary closures. <br /> <br /> <br />3.Remove Pavement Marking Payment shall be made on a per square foot basis as <br />compensation for all equipment, material, and labor costs required for the removal of pavement <br />marking messages, i.e. turn arrows. <br /> <br /> <br />4.Remove Pavement Marking Payment shall be made on a per lineal foot basis as compensation <br />for all equipment, material, and labor costs required for the removal of pavement marking <br />striping, i.e. 4 solid lines. <br /> <br /> <br />5.Pavement Marking Payment shall be made on a per each basis as compensation for all <br />equipment, material, and labor costs required for the transportation, and placement of the <br />required pavement markings shown on the plans. <br /> <br /> <br />6.Pavement Striping Payment shall be made on a per lineal foot basis as compensation for all <br />equipment, material, and labor costs required for the transportation, and placement of the <br />required pavement striping shown on the plans, based upon type, and size. <br />SP 5 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.