My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 06/20/2017
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2017
>
Agenda - Public Works Committee - 06/20/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:08:07 AM
Creation date
6/16/2017 10:23:56 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
06/20/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor because of the presence and protection of those utilities and appurtenances. The <br />Contractor shall comply with the provisions of Minnesota Statues Chapter 216 related to <br />underground construction and utility protection (Gopher State One call). <br /> <br /> <br />13.Maintenance during Construction <br />Once the Contractor commences work on the project, the construction area shall be maintained for <br />the remainder of the project by the Contractor at their expense. Necessary signs and barricades <br />shall be furnished by the Contractor. All existing surfaces not scheduled for removal shall be <br />protected. All equipment which operates on bituminous or concrete surfaces shall be equipped <br />with rubber tires. The Contractor shall provide reasonable access to all properties adjacent to the <br />work. The cost of providing and maintaining continuous access where applicable, shall be <br />included in the lump sum bid item price for Traffic Control. Any disturbed paved areas at <br />intersections with public or private roads/driveway accesses must be brought to grade with class 5 <br />at the end of each work day, unless road is closed for construction. <br />All unpaved surfaces shall be bladed and made passable at the end of each business day, unless <br />road is closed for construction. Grading the surface will also be as directed by the Engineer when <br />the travel lane is deemed impassable. <br /> <br /> <br />14.Surface Water and Sedimentation Control <br />The Contractor shall take reasonable efforts to prevent soils from being deposited onto street <br />surfaces. Temporary earth stockpiles shall have suitable erosion control measures in place to <br />prevent this material from migrating onto the street and into the storm sewer system. The <br />Contractor shall have a sweeper on site during construction or must have the availability of one on <br />site within three hours. Streets shall be left clean at the end of each working day. <br />Contractor will be expected to provide a water truck for dust control. Water is available at the <br />automated water fill station located at the Public Works Facility on Jaspar Street and 142nd <br />Avenue NW. Water will not be allowed to be drawn from City hydrants. <br /> <br /> <br />15.Tree Protection <br />The contractor shall employ the following tree protection measures to encourage the survival of <br />trees affected by construction. Roots larger than one half inch in diameter which have been <br />fractured as a result of grading operations shall be sawed flush with a bow saw or loppers as soon <br />as possible after being disturbed. No unnecessary vehicles shall be allowed in the tree root zone <br />to avoid compaction of soil. <br /> <br /> <br />SP 4 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.