My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 11/04/2004
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2004
>
Agenda - Planning Commission - 11/04/2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 9:34:29 AM
Creation date
11/1/2004 8:51:34 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
11/04/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The sketch plan is also showing an outlot at the ~vestern most portion of 148th Avenue in the plat. <br />City Code requires that streets be brought to the edge of the plat to facilitate development on <br />adjacent parcels, should it occur. A temporary cul-de-sac will need to be provided on 147~l' Lane <br />NW~ this street also exceeds the maximum cul-de-sac length as outlined in City Code. <br /> <br />The sketch plan is showing a 30-foot setback from all'bui'!dings to the exterior boundary lines, <br />which complies with the R-2 zoning district. The plan is also showing a 25-foot separation <br />between buildings, which complies with the R-2 district. More detailed review of setbacks will <br />occur at the site plan review stage. <br /> <br />A detailed drainage and grading plan will be reviewed during the preliminary plat process. The <br />project is subject to the review and permitting process of the Lower Rum River Watershed <br />Management Organization (WMO). <br /> <br />The Park and Recreation Commission will also review the sketch plan for recommendations on <br />park dedication and tra.il requirements. <br /> <br />Recommendation: <br /> <br />While there are many details that must be worked out in the preliminary plat and Site plan stages, <br />the proposed sketch plan is consistent with the first 2 phases of Town Center Gardens. Staff finds <br />the sketch plan generally acceptable subject to further review of grading and drainage, street <br />design, overall density on the site, and the adoption of an amendment to the Comprehensive Plan <br />and rezoning the subject parcel to TC-4a. <br /> <br />Commission Action: <br /> <br />Motion to approve/deny the sketch plan of Town Center Gardens 3rd Addition contingent upon <br />compliance with City Staff Review Letter dated July 30, 2004, revised October 29, 2004. <br /> <br />Review Checklist: <br />Assistant Communi~ Development Director <br />City, Engineer <br /> <br />PC: 11/04/04' <br /> <br />24 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.