My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/27/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 06/27/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:33:55 PM
Creation date
7/11/2017 8:03:38 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/27/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1054
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(20 NTI <br />NORTHERN <br />TECHNOLOGIES, WC. <br />January 14, 2016 <br />1408 Northland Drive, Suite 1D7 <br />Mendota Heights, MN 55120 <br />P:7B2.423.9175 F:651.3B9.419❑ <br />www.NTlgeo.com <br />Bolton & Menk, Inc. <br />Attention: Kevin Kielb, P.E. <br />2035 County Road D East, Suite B <br />Maplewood, MN 55109 <br />Subject: Geotechnical Exploration and Engineering Review <br />Riverdale Drive Improvement Project <br />Ramsey, Minnesota <br />NTI Project No. 15.61197.100 <br />Unearthing confidenceTM <br />Northern Technologies, Inc. (NTI) has completed a total of 5 soil borings for the Riverdale Drive <br />reconstruction project in Ramsey, Minnesota. The scope of services included determining existing <br />subsurface conditions and providing recommendations for site preparation, excavations, engineered fill <br />and compaction, depths of unsuitable soils to be removed, ground water management and potential <br />difficulties during construction. Our services were performed in accordance with our proposal dated <br />November 15, 2015. <br />PROJECT AND SITE DESCRIPTION <br />The proposed project consists of the construction of Riverdale Drive between Traprock Street Northwest <br />and Ramsey Boulevard in the City of Ramsey, Minnesota. NTI assumes that the proposed project may <br />include below grade utility improvements, minor grade changes and the construction of an asphalt <br />surfaced roadway. <br />NTI was not aware of invert elevations or other design details of the proposed utilities at the time this <br />report was prepared. <br />SUBSURFACE EXPLORATION SUMMARY <br />NTI performed the subsurface exploration program on December 21, 2015 with a two -person crew using <br />a truck -mounted CME-55 drill rig. Samples were generally collected in accordance with ASTM D 1586 <br />"Standard Test Method for Standard Penetration Testing (SPT) and Split -Barrel Sampling of Soils." <br />Precision Expertise Geotechnical • Materials <br />rnRGO LBISMARCK • GRAND FORKS MINOT • MENDOTA HEIGHTS • RAMSEY • ST• CLOUD <br />
The URL can be used to link to this page
Your browser does not support the video tag.