My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/27/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 06/27/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:33:55 PM
Creation date
7/11/2017 8:03:38 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/27/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1054
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Riverdale Drive Improvements <br />Ramsey, Minnesota <br />NTI Project No. 15.61197.100 <br />The boring locations and depths were determined by Bolton & Menk, Inc. personnel. The borings <br />terminated at nominal of 10 feet below the existing ground surface. NTI estimated ground surface <br />elevations based upon publically available MNTopo LiDAR data. Subsurface conditions are summarized <br />in the table below. Please refer to the boring logs for additional information. <br />Table 1: Pavement and Subgrade Summary <br />Apparent <br />Boring Topsoil Fill) Subgrade Native Subgrade <br />No. Thickness 1 Material Material <br />(in) <br />Notes <br />B 1 18 SP-SM SP 4 1/2 Feet of Agricultural Till Zone/ Existing <br />Fill <br />B-2 10 SP-SM SP-SM 4 1/2Feet of Agricultural Till Zone/ Existing <br />Fill <br />B-3 18 NE 2 SP-SM <br />B-4 SP-SM, SC SM 4 1/2Feet of Agricultural Till Zone/ Existing <br />Fill <br />B-5 8 SP-SM SP-SM 4 1/2Feet of Agricultural Till Zone/ Existing <br />Fill <br />1. Material appeared to contain organic matter. This material may not necessarily meet MnDOT or other <br />specifications for topsoil. <br />2. Fill not encountered in the soil boring. <br />GROUNDWATER AND GROUNDWATER CONTROL <br />Groundwater was not observed in our soil borings at the time of our explorations. Groundwater <br />elevations can change due to precipitation events seasonally, changes in topography and site <br />development, and due to long-term climate changes. Also, soil conditions between borings may be <br />conducive to localized seeps or perched water zones that may be permanent or transient. <br />UTILITIES <br />The fill and native soils observed in soil borings were generally suitable for utility support. For utilities <br />with planned invert elevations within the existing fill, we recommend that at least the upper 1 foot of <br />the excavation subgrade be scarified, moisture conditioned and re -compacted. In addition, areas <br />unstable or organic laden soils (if encountered) should be subcut and replaced with engineered fill <br />consisting of non -organic debris free mineral soil of similar composition as the underlying native soils. <br />Groundwater, if encountered, should be maintained at least 2 feet below the bottom of the excavation. <br />The Geotechnical Engineer of Record or their designated representative should observe the project <br />excavations to determine that unsuitable materials have been properly removed and adequate bearing <br />support is provided by the exposed soils. The exposed soil at the base should be compacted with a <br />vibratory roller to 95 percent standard Proctor dry density (ASTM D698). Such observations and testing <br />should be performed prior to backfilling. <br />The on -site non -organic soils are anticipated to be suitable for reuse if properly moisture conditioned <br />and compacted. Replacement backfill required in utility trenches should consist of non -organic material <br />similar to the surrounding soil. <br />Page 2 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.