az) <br />Riverdale Drive Improvements <br />Ramsey, Minnesota <br />NTI Project No. 15.61197.100 <br />All import fill should generally consist of non -organic debris free soils of similar composition to the in <br />place native soils. All import fill soils should be approved by NTI or the City's representative prior to <br />utilization. <br />It is especially important that trench backfill for utility construction within paved areas be thoroughly <br />compacted to minimize future pavement damage. We recommend that such soils be compacted in <br />accordance with the recommendations noted in the "Placement and Compaction of Engineered Fill" <br />section in Appendix B of this report. <br />The stability of embankments along utility excavations is dependent on soil strength, site geometry, <br />moisture content, and any surcharge load for excavated soils and equipment. We present cautionary <br />remarks concerning stability of excavation side slopes in the "Excavation Stability" section of this report. <br />The Contractor is solely responsible for assessing the stability of and executing underground utility and <br />project excavations using safe methods. The contractor is also responsible for naming the "competent <br />individual" as per Subpart P of 29 CFR 1926.6 (Federal Register - OSHA). <br />PAVEMENT RECOMMENDATIONS <br />The most conservative method of subgrade preparation would be remove the undocumented fill soils <br />and replace them properly compacted engineered fill. This method of subgrade preparation would <br />provide the most uniform subgrade but would also be the most costly method of construction and <br />relatively a -typical considering the relative uniformity of the subgrade soils encountered within the soil <br />borings. <br />If the City is willing to accept some risk in regard to the future pavement performance, NTI recommends <br />that prior to installing the aggregate base that the existing subgrade be scarified and re -compacted to a <br />depth of at least 12 inches. A proof roll test should then be performed to determine soft or unstable <br />subgrade areas. If rutting or localized unstable subgrade areas are observed, those areas should be <br />subcut, moisture -conditioned, and re -compacted or removed to a stable depth. Excavations for soil <br />corrections in paved areas should allow for a 2 foot oversize beyond the edges of the pavement. <br />The proof roll should be performed with a tandem axle dump truck loaded to gross capacity (at least 20 <br />tons). Acceptance criteria of the proof roll shall be limited to rut formation no more than one inch <br />depth (front or rear axles) and no pumping (rolling) observed during the visual inspection. Proof roll <br />tests should be observed by an experienced technician or geotechnical engineer prior to placement of <br />the aggregate base course to verify the subgrade will provide adequate pavement support. <br />If imported fill is required in paved areas it should consist of debris free, non -organic, mineral soil similar <br />in composition to the subgrade soils encountered in the surrounding areas. If sand is imported into <br />areas that are underlain by relatively impervious fine grained soils the sand layer should be drained with <br />drain tile in order to prevent frost heave from water trapped within the imported sand layer during <br />freezing temperatures. Similarly, if clay is used in conjunction with lane widening, drainage from any <br />existing granular soils may be impeded unless subsurface drainage is included. Individual lifts of <br />engineered fill should be tempered for moisture content, placed and compacted as noted in the <br />"Placement and Compaction of Engineered Fill" section in Appendix B of this report. <br />MINIMUM PAVEMENT THICKNESS <br />Estimates of minimum thicknesses for new pavement sections for this project have been based on the <br />procedures outlined in the MnDOT Pavement Design Manual using soil parameters based on soil types. <br />Page 3 of 14 <br />