Laserfiche WebLink
31. Hydroseeding — Payment shall be made on a per acre basis as compensation for all equipment, <br />material and labor costs required for the establishment of seed in disturbed areas as directed <br />by the Engineer. Seed, fertilizer, and mulch shall be compensated per the basis shown on the <br />pay estimate. <br />SP 8 <br />