Laserfiche WebLink
Strap two (2) wooden saddle blocks to each pipe length to provide support at regular <br />intervals. <br />Center carrier pipe in casing at all times. <br />Partially fill annular space between casing and carrier pipe with dry blown sand. Space <br />shall be considered filled when dry sand blows out of opposite end of casing pipe. <br />Seal each end of the casing with a concrete bulkhead after the sand has been <br />deposited. <br />The location, size, and configuration of all jacking pits shall be subject to approval of the <br />Engineer. <br />C2 Directional Boring <br />Direction boring/drilling installation shall be accomplished where required on the Plans or in the <br />Special Provisions to minimize disturbance of existing surface improvements. The installer shall <br />have a minimum of five (5) years of experience in this method of construction and have <br />successfully installed at least ten thousand feet (10,000') of eight inch (8") or larger diameter <br />pipe to specified grades. The field supervisor employed by the Contractor shall have at least five <br />(5) years of experience and shall be at the site at all times during the boring/drilling installation. <br />The Contractor shall submit boring/drilling pit locations to the Engineer before beginning <br />construction. Boring pits may be located within roadway right-of-way and easements. Any other <br />boring pit locations that may be desired by the Contractor for boring or other uses shall be the <br />responsibility of the Contractor to attain authorization, including use of private property. <br />Unless otherwise provided in the Special Provisions, the Contractor shall be compensated for <br />the restoration work only within the areas at the connection points, or other locations as may be <br />approved by the Engineer. The Contractor shall be responsible for repairs, without <br />compensation, for any other repair areas, including pit/boring points and areas above the drilled <br />pipe where drilling fluid pressure may have caused heaving or damage to pavement and other <br />surfaces. <br />The drilling equipment shall be capable of placing the pipe as shown on the plans. The <br />installation shall be by a steerable drilling tool capable of installing continuous runs of pipe <br />between appurtenances such as valves, manholes, etc., without intermediate pits. The guidance <br />system shall be capable of installing pipe within one and one half inch (1 1/2") of the plan vertical <br />dimensions and two inches (2") of the plan horizontal dimensions. The Contractor shall remove <br />and reinstall pipes which vary in depth and alignment from these tolerances. <br />Pull back forces shall not exceed the allowable pulling forces for the pipe being installed. Drilling <br />fluid shall be a mixture of water and bentonite clay, and shall be suitable for existing soil <br />conditions. Disposal of excess fluid and spoils shall be the responsibility of the Contractor. <br />D Placement of Insulation <br />Rigid insulation board shall be placed within the pipe encasement zone, six inches (6") above <br />the pipe. <br />Page 14 <br />