My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/27/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 06/27/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:33:55 PM
Creation date
7/11/2017 8:03:38 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/27/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1054
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Each layer of backfill material shall be compacted effectively, by approved mechanical or hand <br />methods, until there is no further visual evidence of increased consolidation or the density of the <br />compacted layer conforms to the density requirements specified in the Special Provisions. <br />Compaction of each layer shall be completed acceptably before placing material for a <br />succeeding layer thereon. The manner of placement, compaction equipment, or procedure <br />effectiveness shall be subject to approval of the Engineer. <br />All surplus or waste materials remaining after completion of the backfilling operations shall be <br />disposed of in an acceptable manner within twenty four (24) hours after completing the backfill <br />work on each particular pipeline section. Disposal at locations within the project limits shall be <br />as specified, or as approved by the Engineer; otherwise, disposal shall be accomplished outside <br />the project limits at the Contractor's discretion. The backfilling and surplus or waste disposal <br />operations shall be a part of the work required under the pipeline installation items, without until <br />final cleanup. <br />Compaction of backfill within Roadbed areas shall meet the density requirements of MnDOT <br />Specification 2105.3 F1. Compaction of backfill in all other areas shall be as required in the <br />Special Provisions. <br />Until expiration of the guarantee period, the Contractor shall assume full responsibility and <br />expense for all backfill settlement and shall refill and restore the work as directed to maintain an <br />acceptable surface condition, regardless of location. All additional materials required shall be <br />furnished without cost to the Owner. <br />Any settlement of road surfaces placed under this Contract and that are within the guarantee <br />period that are in excess of one inch (1 "), as measured by a ten foot (10') straight edge -shall be <br />considered failure of the mechanical compaction. The Contractor shall be required to repair <br />such settlement without cost to the Owner. <br />F Restoration of Surface Improvements <br />Wherever any surface improvements such as pavement, curbing, pedestrian walks, fencing, or <br />turf have been removed, damaged or otherwise disturbed by the Contractor's operations, they <br />shall be repaired or replaced to the Engineer's satisfaction, as will restore the improvement in <br />kind and structure to the preexisting condition. Each item of restoration work shall be done as <br />soon as practicable after completion of installation and backfilling operations on each section of <br />pipeline. <br />In the absence of specific payment provisions, as separate Contract Items, the restoration work <br />shall be compensated for as part of the work required under those Contract Items which <br />necessitated the destruction and replacement or repair, and there will be no separate payment. <br />If separate pay items are provided for restoration work, only that portion of the repair or <br />reconstruction which was necessitated by the Contract work will be measured for payment. Any <br />improvements removed or damaged unnecessarily or undermined shall be replaced or repaired <br />at the Contractor's expense. <br />G Maintenance and Final Cleanup <br />All subgrade surfaces shall be maintained acceptably until the start of surfacing construction or <br />restoration work, and until the work has been finally accepted. Additional materials shall be <br />Page 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.