My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/27/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 06/27/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:33:55 PM
Creation date
7/11/2017 8:03:38 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/27/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1054
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
be kept clean. The watermain materials shall be carefully lowered into laying position by the use <br />of suitable restraining devices. Under no circumstances shall the pipe be dropped or dumped <br />into the trench. <br />As each length of bell and spigot pipe is placed in laying position, the spigot end shall be <br />centered in the bell and the pipe forced home and brought to correct line and grade. The pipe <br />shall be secured in place with approved encasement and backfill materials. <br />When pipe laying is not in progress, all open ends of the pipe line shall be closed by watertight <br />plugs or other means approved by the Engineer. If water is present in the trench, the plugs shall <br />remain in -place until the trench is pumped completely dry. <br />When connecting to existing stubs, the Contractor shall prevent dirt or debris from entering the <br />existing pipe. <br />A3 Aligning and Fitting of Pipe <br />The cutting of pipe for inserting valves, fittings, or closure pieces shall be done in a neat and <br />workmanlike manner without damage to the pipe and so as to leave a smooth square -cut end. <br />Pipe shall be cut with approved mechanical tools. Flame cutting will not be allowed under any <br />conditions. All rough edges shall be removed from the cut ends of pipe and, where rubber <br />gasket joints are used, the outer edge shall be rounded or beveled by grinding or filing to <br />produce a smooth fit. <br />When necessary to deflect pipe from a straight line either in the vertical or horizontal plane, —to <br />avoid obstructions, plumb stems, or produce a long radius curve when permitted, the amount of <br />deflection allowed at each joint shall not exceed the -limits to maintain a satisfactory joint seal in <br />conformance with AWWA C-600 for ductile iron pipe mechanical and push -on joints, AWWA C- <br />605 for PVC pipe and AWWA M55 for PE pipe. The maximum angular deflection at any joint for <br />other pipe materials and joints shall not exceed the manufacturer's recommendations. If the <br />specified alignment requires angular deflections greater than recommended or allowed, the <br />Contractor shall provide appropriate bends or shorter pipes such that the maximum angular <br />deflection is not exceeded <br />A4 Blocking and Anchoring of Pipe <br />All plugs, caps, tees, bends, and other thrust points shall be provided with reaction backing, or <br />movement shall be prevented by attachment of suitable restraining devices or tie rods, in <br />accordance with the requirements of the Plans, Specifications, and Special Provisions. <br />In the absence of other specified requirements for reaction backing or restraining devices, the <br />following provisions shall apply: <br />(1) All horizontal bends exceeding twenty (20) degrees deflection, and all caps, plugs, <br />and branch tees shall be provided with concrete buttress blocking. <br />(2) All vertical bends exceeding twenty (20) degrees deflection shall be provided with <br />concrete buttress blocking at the low points and with metal tie rod or strapping <br />restraints at the high points. <br />(3) Offset bends made with standard offset fittings need not be strapped or buttressed. <br />Page 28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.