My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/27/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 06/27/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:33:55 PM
Creation date
7/11/2017 8:03:38 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/27/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1054
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
lour 1111.1siion: To work together to reiposihty grow our community, and to provide quality, coat -effective, and efficient government ierrlcas. <br />CC Regular Session 7. 6. <br />Meeting Date: 06/27/2017 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Information <br />Title: <br />Adopt Resolution #17-06-149 Approving Plans and Specifications and Authorizing Advertisements for Bids for <br />Improvement Project #17-04, Sunwood Drive Striping Improvements <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #17-06-149 approving plans and specifications and authorizing <br />advertisements for bids for Improvement Project #17-04, Sunwood Drive Striping Improvements. <br />Background: <br />The existing striping along Sunwood Drive between Armstrong Boulevard and Ramsey Boulevard is missing or <br />faded in many areas, and some areas are not striped appropriately based on development that occurred since the <br />street was originally striped. Staff therefore prepared plans and specifications for completing striping improvements <br />along this segment of Sunwood Drive in 2017, which is Improvement Project #17-04. <br />Staff presented preliminary draft plans for proposed Sunwood Drive striping improvements to the Public Works <br />Committee on April 18th. Based on feedback received from the Public Works Committee Staff prepared draft plans <br />and specifications which were presented to the Public Works Committee on June 20th. The Public Works <br />Committee recommended City Council approval of plans and specifications. Attached are copies of the draft plans <br />and specifications. <br />In summary, the draft plans replace all existing center two-way turn lanes with dedicated left turn lanes for public <br />streets and private accesses based on existing access locations. Several dedicated right turn lanes were also added. <br />The plans incorporate dedicated left turn lanes for Casey's gas station and convenience store, the west driveway for <br />the Residence at the COR apartments, and for the new segment of Yolite Street south of Sunwood Drive that will be <br />constructed as part of the Stonebrook Day Care development. In addition, dedicated right turn lanes are proposed at <br />Yolite Street, Casey's, and Center Street. <br />No street sign removals or improvements are shown in the plans. Public Works staff will complete this work <br />in-house using existing staff and resources. <br />If the attached plans and specifications are approved and advertisements for bids are authorized this evening, the <br />proposed project schedule would be as follows: <br />• June 27th — Council approves plans and specifications and authorizes bids <br />• June 30th and July 7th — Bids advertised <br />a July 21 st — Public bid opening <br />
The URL can be used to link to this page
Your browser does not support the video tag.