My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/27/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 06/27/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:33:55 PM
Creation date
7/11/2017 8:03:38 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/27/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1054
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• July 25th — Council accepts bids and awards contract <br />• August 7th — Begin construction <br />• August 25th — Complete construction <br />Notification: <br />No notifications are required for this case. <br />Observations/Alternatives: <br />Observations: <br />Striping improvements on Sunwood Drive, east of Rhinestone Street and west of Zeolite Street, are proposed to be <br />completed as part of the 2017 Crackseal and Sealcoat Improvements project. This evening, Council will consider <br />awarding a contract for construction for the 2017 Crackseal and Sealcoat Improvements. This work is proposed to <br />be complete before September meaning all striping improvements on Sunwood Drive between Armstrong <br />Boulevard and Ramsey Boulevard will be complete before any Happy Days events begin. <br />Alternatives: <br />Alternative #1 — Motion to adopt Resolution #17-06-149 approving plans and specifications and authorizing <br />advertisements for bids for Improvement Project #17-04, Sunwood Drive Striping Improvements. <br />Alternative #2 — Motion to deny adoption of Resolution #17-06-149 at this time. <br />Funding Source: <br />The engineer's estimate for construction costs is $16,842.10. Total project costs, including 23% indirect costs, is <br />$20,715.78. <br />Funding for the proposed improvements is proposed through the Public Improvement Revolving Fund, which has a <br />fund balance of approximately $4,000,000. <br />Recommendation: <br />Staff recommends alternative # 1 due to the poor condition of the existing pavement striping, and to address <br />numerous access location changes that occurred over the years. <br />Action: <br />Adopt Resolution #17-06-149 approving plans and specifications and authorizing advertisements for bids for <br />Improvement Project #17-04, Sunwood Drive Striping Improvements. <br />Resolution 1706149 <br />IP1704 Plans Draft <br />IP1704 Specs Draft <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />Grant Riemer Grant Riemer 06/21/2017 03:24 PM <br />Kurt Ulrich Kurt Ulrich 06/22/2017 11:38 AM <br />Form Started By: Bruce Westby Started On: 06/19/2017 06:54 AM <br />Final Approval Date: 06/22/2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.