Laserfiche WebLink
STANDARD GENERAL CONDITIONS OF THE <br />CONSTRUCTION CONTRACT <br />TABLE OF CONTENTS <br />Page <br />Article 1— Definitions and Terminology 1 <br />1.01 Defined Terms 1 <br />1.02 Terminology 5 <br />Article 2 — Preliminary Matters 6 <br />2.01 Delivery of Bonds and Evidence of Insurance 6 <br />2.02 Copies of Documents 6 <br />2.03 Before Starting Construction 6 <br />2.04 Preconstruction Conference; Designation of Authorized Representatives 7 <br />2.05 Initial Acceptance of Schedules 7 <br />2.06 Electronic Transmittals 7 <br />Article 3 — Documents: Intent, Requirements, Reuse 8 <br />3.01 Intent 8 <br />3.02 Reference Standards 8 <br />3.03 Reporting and Resolving Discrepancies 8 <br />3.04 Requirements of the Contract Documents 9 <br />3.05 Reuse of Documents 10 <br />Article 4 — Commencement and Progress of the Work 10 <br />4.01 Commencement of Contract Times; Notice to Proceed 10 <br />4.02 Starting the Work 10 <br />4.03 Reference Points 10 <br />4.04 Progress Schedule 10 <br />4.05 Delays in Contractor's Progress 11 <br />Article 5 —Availability of Lands; Subsurface and Physical Conditions; Hazardous Environmental <br />Conditions 12 <br />5.01 Availability of Lands 12 <br />5.02 Use of Site and Other Areas 12 <br />5.03 Subsurface and Physical Conditions 13 <br />5.04 Differing Subsurface or Physical Conditions 14 <br />5.05 Underground Facilities 15 <br />EJCDC° C-700, Standard General Conditions of the Construction Contract. <br />Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, <br />and American Society of Civil Engineers. All rights reserved. Page i <br />