My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/27/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 06/27/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:33:55 PM
Creation date
7/11/2017 8:03:38 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/27/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1054
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01110 - SUMMARY OF WORK <br />PART 1-- GENERAL <br />1.1 PROJECT LOCATION <br />A. The project is located in Ramsey, MN. The project location is shown on the vicinity map in the design <br />drawing set. <br />1.2 PROJECT DESCRIPTION <br />A. The project involves but is not limited to the complete construction of public improvements for the <br />reconstruction of several streets. Individual elements of work shall include, but are not limited to: <br />1. Removal of bituminous pavement, concrete curb and gutter, sidewalk and driveways, pipe and other <br />miscellaneous items. <br />2. Clearing and grubbing. <br />3. Street excavation. <br />4. Watermain construction. <br />5. Storm sewer construction. <br />6. Concrete walk construction. <br />7. Concrete curbing and driveway pavement construction. <br />8. Bituminous street construction <br />9. Turf restoration and erosion control construction <br />10. Traffic Control. <br />11. Other miscellaneous work shown on the plans or specified herein. <br />1.3 CONTRACTOR USE OF PROJECT SITE <br />A. The Contractor's use of the project site shall be limited to its construction operations, including on -site <br />storage of materials and field offices. No materials shall be stored in a location as to limit access to the <br />affected public. Any damage caused by Contractor operations to private property, including but not <br />limited to, parking lots, trees, shrubs, material spatter, etc. shall promptly be corrected at the Contractor's <br />expense. <br />PART 2 -- PRODUCTS (NOT USED) <br />PART 3 -- EXECUTION <br />3.1 OPERATIONAL LIMITATIONS AND REQUIREMENTS <br />A. The Contractor shall confine its work within the limits of the easements, public rights -of -way, and/or <br />construction limits as shown on the plans. If the Contractor desires additional space, it shall be the <br />Contractor's responsibility to acquire easements and/or permission, as desired. <br />3.2 BARRICADES <br />A. The Contractor shall furnish and install any necessary barricades to protect the public or workers during the <br />project. Barricades to keep public out of construction areas shall be left in place until removed by <br />City of Ramsey — R16.111092 SUMMARY OF WORK <br />April 5, 2017 PAGE 01110-1 <br />V040111 © Bolton & Menk, Inc. 2016, All Rights Reserved <br />
The URL can be used to link to this page
Your browser does not support the video tag.