SECTION 01270 - MEASUREMENT & PAYMENT <br />PART 1-- GENERAL <br />1.1 SUMMARY <br />A. Methods of measurement and payment for all items not individually specified shall be according to the <br />appropriate referenced specification standard. <br />1.2 MEASUREMENT & PAYMENT <br />A. Payment for Hauled Materials: No compensation will be paid for any weigh ticket received after the date <br />shown on the ticket unless prior arrangements are made with the Engineer. <br />B. Payment for Stored Materials: No compensation will be paid for materials delivered to the site and not <br />incorporated into the project. <br />C. Payment for Major Lump Sum Items: The Contractor shall submit a schedule of values for major items of <br />construction that are bid as lump sum. The schedule shall identify major sections of work and the <br />percentage of the bid price applied to each. Payment shall be made according to the percentage complete <br />of each major section of work. <br />1.3 SUBMITTALS <br />A. The Contractor shall submit to the Engineer a "Certificate of Conformance" statement stating that the scale <br />used to weigh hauled materials has been tested and calibrated for the current construction season. This <br />Certificate shall be from MnDOT or other reliable scale servicing company. Providing a certified scale and <br />obtaining such "Certificate of Conformance" is the sole responsibility of the Contractor and all costs <br />associated are considered incidental to the materials being supplied. <br />B. Hauled Materials: The Contractor shall furnish numbered weigh tickets which list the Date, Project, Type of <br />Material, Gross Weight, Tare Weight, Material Weight in tons, and Truck Number for each load brought to <br />the construction site. If the individual pay items are identified on a unit weight basis, the Contractor shall <br />provide the Engineer with a summary type spreadsheet which provides accumulative job totals of all <br />aggregate and bituminous materials hauled to the project. This spreadsheet shall be submitted to the <br />Engineer on a weekly basis. <br />C. Procured Materials: The Contractor shall furnish an insurance bond showing the type of material, the <br />amount of material, the valuation of the material, the stored location, the project, the date, the name and <br />address of the surety. <br />D. Compacted Volume Materials: When measurement is specified by the CUBIC YARD, (CY) COMPACTED <br />VOLUME (CV), will be determined by length, width and depth measurements of the material in its placed <br />and compacted position, according to the placement dimensions as shown in the Contract or as designated <br />by the Engineer. <br />PART 2 -- PRODUCTS (NOT USED) <br />PART 3 -- EXECUTION (NOT USED) <br />****END OF SECTION**** <br />City of Ramsey - R16.111092 MEASUREMENT & PAYMENT <br />April 5, 2017 PAGE 01270-1 <br />V011714 © Bolton & Menk, Inc. 2016, All Rights Reserved <br />