My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/27/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 06/27/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:33:55 PM
Creation date
7/11/2017 8:03:38 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/27/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1054
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01310 — COORDINATION <br />PART 1-- GENERAL <br />1.1 SEQUENCE OF CONSTRUCTION <br />A. A written project management scheduling tool (i.e., critical path (CPM), detailed bar chart, etc.) shall be <br />employed by the Contractor for cost value reporting, planning and scheduling of all work required under <br />the Contract Documents. This schedule shall show the order in which the Contractor proposes to execute <br />the work with dates on which it proposes to start the various phases of the work and the estimated <br />completion date of each phase. The Contractor shall submit a preliminary version of its intended schedule <br />within 10 working days following the Notice of Award on the attached form or on a form of its own <br />choosing. The Contractor is required to show the initial critical path (CPM) of tasks to be performed. <br />B. Unless otherwise approved by the Engineer, the schedule shall also include an anticipated payment <br />schedule for the volume of work to be completed each month. This schedule shall indicate the Contractor's <br />intention and ability to complete the work within the contract times, as specified in Article 4 of the <br />Agreement. <br />C. The Preconstruction Conference as outlined in Section 01315 will not be conducted until the schedule is <br />submitted. In addition, no construction staking shall be provided until the schedule is submitted by the <br />Contractor and reviewed by the Engineer. <br />1.2 WORKING HOURS <br />A. Except in connection with safety or emergency situations, all work at the site shall be performed during <br />daylight hours. <br />B. The Contractor shall notify the Owner and Engineer of any work planned on Saturday, Sunday, or any legal <br />holidays at least 48 hours prior to such work. <br />C. The Contractor shall coordinate any construction or hauling activity in the vicinity of churches, schools, <br />medical facilities, and funeral homes. The Contractor shall be cognizant of the disruptive effects of <br />continued construction during funerals. The Owner reserves the right to temporarily stop construction <br />within one block of, and during the time of, any funeral procession. No compensation shall be granted to <br />the Contractor due to temporary delays caused by funerals. <br />1.3 TRAFFIC CONTROL <br />A. See reference S-12 — Maintenance and Control of Traffic. <br />1.4 COORDINATION WITH BUSINESSES AND PRIVATE PROPERTY OWNERS ADJACENT TO THE PROJECT <br />A. The Contractor shall notify all property owners and occupants adjacent to the project 2 days in advance to <br />allow moving machinery and/or vehicles or other items that may be blocked in or damaged due to the <br />upcoming construction in the area. Access to the properties shall be restored as soon as possible after each <br />phase of construction. <br />1.5 COORDINATION WITH UTILITY COMPANIES <br />A. The Contractor is responsible for working with public and private utility companies in protecting and/or <br />relocating existing or new utility lines located near and affected by this construction. <br />City of Ramsey - R16.111092 <br />April 5, 2017 <br />COORDI NATION <br />PAGE 01310-1 <br />V040110 © Bolton & Menk, Inc. 2016, All Rights Reserved <br />