My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/27/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 06/27/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:33:55 PM
Creation date
7/11/2017 8:03:38 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/27/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1054
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. The Contractor shall furnish all sample materials required for these tests and shall deliver the same <br />without charge to the testing laboratory or other designated agency when and where directed by <br />them. <br />D. Additional Tests <br />1. In addition to those tests required by the individual technical specifications and/or referenced <br />specifications: <br />(a) Additional tests required beyond these required under this specification may be ordered by the <br />Engineer to settle disagreements with the Contractor regarding quality of work done. If the work <br />is defective, the Contractor shall pay all costs of the additional tests and shall correct the work. If <br />the work is satisfactory, the Owner will pay for the additional tests. <br />(b) The Owner may perform televised inspection of any and/or all under construction included in this <br />project, at its own expense, at any time prior to final payment. All deficiencies discovered in the <br />course of such investigation shall be corrected at the Contractor's expense and, the Owner's <br />satisfaction, prior to final payment. <br />1.4 ENGINEER'S REPRESENTATIVES AND TESTING <br />A. The Engineer may provide a Resident Project Representative (RPR) to ascertain that the work is <br />accomplished properly and in accordance with the plans and specifications. The RPR shall have full access <br />to the work and shall be given full cooperation. The RPR shall have the authority, subject to the final <br />decision of the Engineer, to reject any defective work or material. The RPR shall have no authority to <br />permit any deviation from the plans and specifications except on written order from the Engineer. <br />B. The presence of the Engineer or any RPRs, however, shall not relieve the Contractor of the responsibility for <br />the proper execution of the work in accordance with all requirements of the Contract Documents. <br />Compliance is a duty of the Contractor, and said duty shall not be avoided by any act or omission on the <br />part of the Engineer or any RPRs. <br />1.5 SITE INVESTIGATION AND CONTROL <br />A. The Contractor shall verify all dimensions in the field and shall check field conditions continuously during <br />construction. The Contractor shall be solely responsible for any inaccuracies built into the work due to his <br />failure to comply with this requirement. <br />B. The Contractor shall inspect related and appurtenant work and shall report in writing to the Engineer any <br />conditions, which will prevent proper completion of the work. Failure to report any such conditions shall <br />constitute acceptance of all site conditions, and any required removal, repair or replacement caused by <br />unsuitable conditions shall be performed by the Contractor at his sole cost and expense. <br />1.6 RIGHT OF REJECTION <br />A. The Engineer, acting for the Owner, shall have the right, at all time and places, to reject any articles or <br />materials to be furnished hereunder which in any respect, fail to meet the requirements of these <br />specifications, regardless of whether the defects in such articles or materials are detected at the point of <br />manufacture or after completion of the work at the site. If the Engineer or RPR, through an oversight or <br />otherwise, has accepted materials or work which is defective or which is contrary to the specifications, such <br />material, no matter in what stage or condition of manufacture, deliver, or erection, may be rejected by the <br />Engineer for the Owner. <br />PART 2 -- PRODUCTS (NOT USED) <br />PART 3 -- EXECUTION (NOT USED) <br />City of Ramsey - R16.111092 <br />April 5, 2017 <br />****END OF SECTION**** <br />QUALITY CONTROL <br />PAGE 01450-2 <br />V040110 © Bolton & Menk, Inc. 2016, All Rights Reserved <br />
The URL can be used to link to this page
Your browser does not support the video tag.