SECTION 01500 — MOBILIZATION <br />PART 1-- GENERAL <br />1.1 SUMMARY <br />A. This section covers the mobilization of all labor, materials, tools, equipment and performances of all work <br />and services necessary or incidental to construct the project, including but not limited to, the <br />demobilization associated with closing the project, removing all equipment, removing excess materials, and <br />general clean-up. <br />1.2 METHOD OF MEASUREMENT AND PAYMENT <br />A. Mobilization shall be measured by the LUMP SUM and paid in accordance with the following schedule. <br />1. On the first partial estimate that shows work performed on at least one major contract item, 25 <br />percent of the amount bid for Mobilization will be paid, but not more that 3 percent of the original <br />Contract amount. <br />2. On subsequent partial estimates, payment shall be made at the same percentage as the value of work <br />completed to date relative to the original Contract amount, except that payment shall not be reduced <br />from the original 25 percent. Materials on hand shall be excluded from the payment ratio <br />computation. <br />3. At such time that 95 percent of the original Contract amount is earned, full payment for Mobilization <br />shall be made. <br />1.3 SPECIFICATION REFERENCES <br />A. MnDOT Specification Section 2021 shall apply to mobilization. <br />B. Unless noted otherwise, the provisions in this section are in addition to the referenced specification. <br />PART 2 -- PRODUCTS (NOT USED) <br />PART 3 -- EXECUTION (NOT USED) <br />City of Ramsey - R16.111092 <br />April 5, 2017 <br />****END OF SECTION**** <br />MOBILIZATION <br />PAGE 01500-1 <br />V040110 © Bolton & Menk, Inc. 2016, All Rights Reserved <br />