Laserfiche WebLink
SECTION 01770 - PROJECT CLOSEOUT <br />PART 1-- GENERAL <br />1.1 FINAL INSPECTION <br />A. After the cleaning up of the work, premises, and all other areas and structures connected with the <br />performance of the contract, the work as a whole, shall be examined by the Engineer and Owner; and, any <br />workmanship or materials found not meeting the requirements of the specifications shall be identified and <br />included on a punch list given to the Contractor. <br />B. The Contractor shall, at its own expense, promptly remove, replace, repair, or otherwise correct the <br />deficiencies with good and satisfactory workmanship and material to the satisfaction of the Owner and <br />Engineer. <br />C. In the event that the Contractor does not satisfactorily remove, replace, repair, or otherwise correct the <br />deficiencies within thirty (30) calendar days after receipt of the punch list, the Owner reserves the right to <br />employ the services of other contractors and/or service organizations to conduct the necessary work and <br />deduct any and all associated costs from final payment to the Contractor. The entry of such other agents <br />on the project to perform this work will not relieve the Contractor from any of its warranty, maintenance or <br />start-up obligations. <br />1.2 PROJECT ACCEPTANCE <br />A. The project shall be accepted after the final examination has been conducted and all settlement, defects, <br />damages, etc., discovered during the previous examination have been remedied. <br />PART 2 -- PRODUCTS (NOT USED) <br />PART 3 -- EXECUTION (NOT USED) <br />City of Ramsey - R16.111092 <br />April 5, 2017 <br />**** END OF SECTION **** <br />PROJECT CLOSEOUT <br />PAGE 01770-1 <br />V040110 © Bolton & Menk, Inc. 2016, All Rights Reserved <br />