My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/27/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 06/27/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:33:55 PM
Creation date
7/11/2017 8:03:38 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/27/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1054
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPECIAL PROVISIONS - SP20I6 BOOK <br />Last Revision by CO Special Provisions: 2/08/17 <br />Created August 20, 2015 <br />Page 25 <br />SP 0202-101 <br />All Pavement marking removal shall be done utilizing either grinding, water -blasting, or <br />sandblasting equipment. <br />S-26 (2104) REMOVING PAVEMENT AND MISCELLANEOUS <br />STRUCTURES <br />Abandoned structures and other obstructions shall be removed from the Right of Way and <br />disposed of in accordance with the provisions of MnDOT 2104, except as modified below: <br />S-26.1 Measurement and payment for the removal and disposal of materials will be made only for those Items of <br />removal work specifically included for payment as such in the Proposal and as listed in the Plans. The removal of <br />any unforeseen obstruction requiring in the opinion of the Engineer equipment or handling substantially different <br />from that employed in excavation operations, will be paid for as Extra Work as provided in MnDOT 1402.5. <br />S-26.2 All removals shall be disposed of by the Contractor outside the Right of Way in accordance with MnDOT <br />2104.3D3 to the satisfaction of the Engineer. <br />S-26.3 Sawing of sidewalks needed for removal shall be incidental. <br />S-27 (2104) RELOCATE MISCELLANEOUS STRUCTURE <br />Payment for Relocate Miscellaneous Structure at the unit price bid per LUMP SUM shall be <br />considered full compensation for all work related to salvaging the existing trail gate and posts and relocating them to <br />the new trail location as directed by the Engineer and shown on the plans. <br />Any damage to the relocated materials shall be repaired or replaced at the Contractors expense and <br />shall only be accepted by the Engineer in equal or better condition than prior to construction activity. <br />S-28 (2105) EXCAVATION AND EMBANKMENT <br />S-28.1 Compaction shall be achieved by the "Quality Compaction Method" described in MnDOT 2105.3F2. <br />S-29 (2211) AGGREGATE BASE <br />Aggregate base courses shall be constructed in accordance with the provisions of MnDOT 2211 <br />except as modified below: <br />S-29.1 Compaction shall be achieved by the "Specified Density Method" described in MnDOT 2211.3D2. <br />S-29.2 Aggregate Base Class 5 shall be salvaged from the City stockpile located at the end of the Jasper Street NW <br />cul-de-sac and shown on the title page of the plan set. <br />a) The stockpile shall be restored to a safe condition once salvaging is complete. <br />S-29.3 Payment for Aggregate Base C15 shall include all labor and equipment required to salvage material from <br />the stockpile , haul the material and place the material as specified. <br />a) The aggregate material shall be provided by the City at no cost to the Contractor. <br />
The URL can be used to link to this page
Your browser does not support the video tag.