Laserfiche WebLink
SPECIAL PROVISIONS - SP20I6 BOOK <br />Last Revision by CO Special Provisions: 2/08/17 <br />Created August 20, 2015 <br />Page 39 <br />SP 0202-101 <br />(4) Check the bins and stockpiles for segregation, contamination, and interblending of the <br />aggregates; <br />(5) Obtain Aggregate Quality samples per Schedule of Materials Control; <br />(6) Observe Producer's Certified Technician obtain aggregate samples and run gradation and <br />moisture tests when possible; <br />(7) Verify cement, fly ash, and admixtures are certified and approved; <br />(8) Obtain cement, fly ash, and admixtures samples per the Schedule of Material Control; <br />(9) Provide the following test results to the Producer in a timely manner: <br />(9.1) Cementitious Materials <br />(9.2) Admixtures <br />(9.3) Verification Gradations <br />(9.4) Coarse Aggregate Quality <br />S-32.28 The first paragraph of MnDOT 2461.3.G.1 shall be deleted and replaced with the following: <br />Notify the Engineer at least 24 h before beginning concrete production to allow the Engineer time <br />to provide inspection forces needed for the work and to approve preparations for concrete placement. If the <br />Contractor fails to provide 24 h notice, the Engineer may delay concrete placement and will consider any <br />concrete incorporated into the work as unauthorized in accordance with 1512.2, "Unauthorized Work." <br />The Engineer will consider any delays to the Contract resulting from unauthorized work as non -excusable <br />in accordance with 1806.2.C, "Non -Excusable Delays." <br />S-32.29 MnDOT 2461.3.G.2 shall be deleted and replaced with the following: <br />G.2 Placement Temperatures <br />Maintain concrete temperature from 50 °F to 90 °F until placement. <br />Unless Engineer approved cold weather protection plans are in —place, do not place concrete when <br />the air temperature is either of the following at the point of placement: <br />(1) Below 36 °F, or <br />(2) The National Weather Service predicts the temperature to fall below 36 °F within the <br />following 24 h period. <br />S-32.30 MnDOT 2461.3.G.4 shall be deleted and replaced with the following: <br />G.4 Field Adjustments <br />Mix the load a minimum of 5 min or 50 revolutions at mixing speed after addition of admixture or <br />water. <br />G.4.a Water Adjustments <br />The Engineer will allow water adjustments in accordance with all the following: <br />(1) Prior to discharging approximately 1 cubic yard of concrete, <br />(2) Water available to add stated on the Certificate of Compliance, and <br />(3) Concrete is within 60 min from the initial batch time stated on the Certificate of <br />Compliance. <br />G.4.b Water Adjustments for Concrete Placed by the Slip -Form Method <br />The Engineer will allow water adjustments for all grades of concrete placed by the slip -form <br />method, except Grade A paving concrete, in accordance with all of the following: <br />(1) If water is available to add as stated on the Certificate of Compliance. <br />(2) Concrete is within 60 min from the initial batch time stated on the Certificate of <br />Compliance. <br />