Laserfiche WebLink
SPECIAL PROVISIONS - SP20I6 BOOK <br />Last Revision by CO Special Provisions: 2/08/17 <br />Created August 20, 2015 <br />Page 40 <br />SP 0202-101 <br />G.4.c Admixture Adjustments <br />Approved admixture additions are allowed within 90 min from the initial batch time stated on the <br />Certificate of Compliance. If the load of concrete has no available water to add, or the load is greater than <br />60 minutes old, the Engineer will allow one admixture adjustment diluted with up to 2 gallons of water. <br />G.4.d Consistency and Air Content Adjustments <br />The Engineer will test the concrete for compliance with 2461.3.G.7, "Consistency," and <br />2461.3.G.8, "Air Content," in accordance with the following: <br />(1) If the first test taken by the Engineer passes, the Engineer will continue verification <br />testing in accordance with the Schedule of Materials Control. <br />(2) If the test taken by the Engineer fails, make adjustments and perform any quality control <br />testing before the Engineer performs a final test. Acceptance or rejection of the truck is <br />based on the Engineer's final test result. <br />(3) The Engineer will test up to two additional trucks in accordance with items (1) and (2) <br />above, and <br />(4) If the concrete does not meet the specification after those three trucks, the Engineer will <br />reduce their verification testing rate to once per truck for acceptance for the remainder of <br />the pour. <br />For concrete mixes 3U17A and 3U18, allow mix to hydrate 5 min before slump test to assure all <br />cement is saturated. <br />S-32.31 MnDOT 2461.3.G.5, 2461.3.G.5.a, 2461.3.G.5.b and 2461.3.G.5.c shall be deleted and replaced <br />with the following: <br />G.5 Test Methods and Specimens <br />Perform random sampling and testing in accordance with the Concrete Manual and determine <br />testing rates meeting the requirements of the Schedule of Materials Control. <br />The Engineer performs random sampling and testing in accordance with the Concrete Manual, <br />determines testing rates meeting the requirements of the Schedule of Materials Control. <br />Anyone fabricating concrete cylinders or beams is required to hold either a current ACI Field 1 <br />Technician Certification or a MnDOT Field 1 Technician Certification. <br />Anyone performing concrete strength testing of cylinders is required to hold one of the following <br />current certifications: <br />(1.1) ACI Strength Testing Technician Certification, <br />(1.2) MnDOT Strength Testing Technician Certification, or <br />(1.3) WisDOT Strength Testing Technician Certification. <br />The Engineer will furnish molds based on the maximum size aggregate for the test specimens in <br />accordance with the following: <br />(2.1) 4 in x 8 in cylinder molds, <br />(2.2) 6 in x 12 in cylinder molds for maximum aggregate sizes greater than 11/4 in, and <br />(2.3) 6 in x 6 in x 20 in beam molds; use other beam mold sizes as approved by the Engineer. <br />The Engineer will transport the cylinders in accordance with the following: <br />(3.1) A minimum of at least 16 hours after casting. <br />(3.2) A minimum of at least 12 hours after casting for high early strength (28-day) cylinders. <br />