My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/27/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 06/27/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:33:55 PM
Creation date
7/11/2017 8:03:38 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/27/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1054
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPECIAL PROVISIONS - SP20I6 BOOK <br />Last Revision by CO Special Provisions: 2/08/17 <br />Created August 20, 2015 <br />Page 41 <br />SP 0202-101 <br />(3.3) With securely placed tight fitting plastic caps on plastic molds, or by other methods to <br />prevent moisture loss. <br />(3.4) Protected from jarring, bouncing, and freezing. <br />(3.5) No greater than 4 hours, unless cylinders are maintained in the moistened condition at <br />ambient temperature of 60 °F to 80 °F. <br />G.5.a Moist Curing Environments <br />At least 24 hours prior to concrete placement, provide moist curing environment(s) of adequate <br />size and number, including all ancillary equipment and materials, necessary to maintain moist curing <br />environment(s) in accordance with ASTM C31, 2031.3.C, "Special Requirements," and the following: <br />For each separate moist curing environment: <br />(1) Provide a calibrated waterproof digital temperature recording device that records the <br />daily maximum and minimum ambient temperatures for the previous 7 days. <br />(2) Maintain the standard (28-day) strength cylinders or beams in an ambient temperature <br />range from 60 °F to 80 °F during the initial and intermediate curing periods. <br />The Engineer will monitor the daily temperatures of the curing environments. Agency monitoring <br />does not relieve the Contractor of the responsibility to maintain the water temperature as specified herein. <br />If the Contractor fails to comply with the requirements shown here -in, the Engineer may delay <br />concrete placement and will consider any concrete incorporated into the work as unauthorized in <br />accordance with 1512.2, "Unauthorized Work." The Engineer will consider any delays to the Contract <br />resulting from unauthorized work as non -excusable in accordance with 1806.2.C, "Non -Excusable Delays." <br />All costs related to providing and maintaining moist curing environments is considered incidental. <br />G.5.b Standard (28-day) Strength Cylinders <br />The Engineer will perform the following for standard strength cylinders: <br />(1.1) Cast cylinders (sets of 3) for testing at 28 days in accordance with the Schedule of <br />Materials Control. <br />(1.2) Mark cylinders for identification of the represented unit or section of concrete in <br />accordance with the following: (1.1, 1.2, 1.3/ 2.1, 2.2, 2.3/ 3.1, 3.2, etc.). In order to <br />differentiate between portions of a project, prefixes and suffixes are allowed. <br />(1.3) Cure the cylinders meeting the requirements of the 2461.3.G.5.a, "Moist Curing <br />Environments." <br />(1.4) Complete the MnDOT Concrete Cylinder Identification Card including the results for air <br />content, slump (if required), concrete, and air temperature testing from the same load. <br />The Concrete Engineer defines the curing period as the following: <br />(2.1) Initial curing period as immediately after final finishing for a period of up to 48 hours. <br />After the initial curing period, the Engineer will both transport and further cure the <br />cylinders in the provided curing tanks for intermediate curing up to 7 days from the day <br />of casting or deliver directly to the laboratory for final curing. <br />(2.2) Intermediate Curing Period as the time between specimen pickup from the initial <br />curing site and delivery to the laboratory for final curing, not to exceed 7 days from the <br />day of casting. <br />(2.3) Final Curing Period as the time when cylinders are cured in the laboratory within 7 days <br />of casting. <br />S-32.32 MnDOT 2461.3.G.5.c shall be deleted and replaced with the following: <br />
The URL can be used to link to this page
Your browser does not support the video tag.