My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/27/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 06/27/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:33:55 PM
Creation date
7/11/2017 8:03:38 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/27/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1054
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPECIAL PROVISIONS - SP20I6 BOOK <br />Last Revision by CO Special Provisions: 2/08/17 <br />Created August 20, 2015 <br />Page 47 <br />SP 0202-101 <br />For the quantity of non -conforming concrete not meeting the required slump, the Engineer will <br />make determinations regarding the disposition, payment, or removal of the concrete in accordance with <br />Tables 2461-23 and 2461-24. <br />Outside of Slump Range <br />Below slump range * <br />< 1'/z in above slump range <br />> 1'/2 in above slump range <br />Table 2461-23 <br />All Concrete Grades <br />> 1 in slump <br />Monetary Reduction <br />No deduction for materials placed as approved by the Engineer. <br />$20.00 per cubic yard or 10% of the Contractor -provided <br />invoice for quantity represented by the materials placed <br />$50.00 per cubic yard or 25% of the Contractor -provided <br />invoice for quantity represented by the materials placed <br />* The Engineer will not reduce contract unit price for low slump concrete placed with the slip -form <br />method as approved by the Engineer. <br />Outside of Slump Range <br />Below slump range * <br /><'/z in above slump range <br />> 3/4 in above slump range <br />Table 2461-24 <br />Low Slump Concrete <br />From % in to 1 in <br />Monetary Reduction <br />No deduction for materials placed as approved by the Engineer <br />$20.00 per cubic yard or 10% of the Contractor -provided invoice <br />for quantity represented by the materials placed <br />$50.00 per cubic yard or 25% of the Contractor -provided invoice <br />for quantity represented by the materials placed <br />* The Engineer will not reduce contract unit price for low slump concrete placed with the slip -form <br />method as approved by the Engineer. <br />S-32.39 MnDOT 2461.3.G.8.a shall be deleted and replaced with the following: <br />G.8.a Non -Conforming Material <br />Only place Type 3 concrete meeting the air content requirements in the work. If the Contractor <br />places Type 3 concrete not meeting the air content requirements into the work, the Engineer will not accept <br />non -conforming concrete at the contract unit price. <br />For the quantity of non -conforming concrete not meeting the required air content, the Engineer <br />will make determinations regarding the disposition, payment, or removal in accordance with <br />Table 2461-27. <br />Air Content, % <br />> 10.0 <br />>8.5 — 10.0 <br />5.0 — 8.5 <br />>4.0 — <5.0 <br />Table 2461-27 <br />All Concrete (Target Air Content 6.5%) <br />Monetary Reduction <br />$50.00 per cubic yard or 25% of the Contractor -provided invoice for quantity represented <br />by the materials placed <br />$20.00 per cubic yard or 10% of the Contractor -provided invoice for quantity represented <br />by the materials placed <br />The Engineer will pay 100 percent of the contract unit price for the concrete represented, <br />for material placed as approved by the Engineer. <br />$50.00 per cubic yard or 25% of the Contractor -provided invoice for quantity represented <br />by the materials placed <br />
The URL can be used to link to this page
Your browser does not support the video tag.