Laserfiche WebLink
SPECIAL PROVISIONS - SP20I6 BOOK <br />Last Revision by CO Special Provisions: 2/08/17 <br />Created August 20, 2015 <br />Page 46 <br />SP 0202-101 <br />Table 2461-20 <br />Chronological Testing Ages of Strength Specimens <br />Type of Concrete Testing Ages * <br />Concrete Pavement as defined in 2301 Determined by the Contractor 11 <br />Normal Strength Concrete as defined in 2461 1, 2, 3, 7 and 28 days <br />High -Early (HE) Concrete as defined in 2461 12 hours, 1, 2, 7 and 28 days <br />Ultra High -Early (UHE) Concrete as defined in 2302 3, 4 and 8 hours, 1 and 14 days <br />* The Contractor may adjust the testing ages if approved by the Engineer, in conjunction with the <br />Concrete Engineer <br />II Test at least two (2) sets of strength specimens before the anticipated opening strength. <br />S-32.36 The first paragraph of MnDOT 2461.3.G.6.c shall be deleted and replaced with the following: <br />Perform a verification strength test to ensure the in place concrete strength correlates with the <br />maturity -strength relationship as follows: <br />(1) Notify the Engineer at least 24 hours in advance of the time and location of both the <br />verification specimen's casting and strength testing. <br />(2) When the maturity curve is developed prior to the start of construction or in a laboratory, <br />perform a verification strength test on the first day of concrete placement. <br />(3) Perform a verification strength test at least once every seven (7) calender days during <br />normal plant production for concrete paving. For all other concrete, perform a <br />verification strength test at least once every thirty (30) calendar days during normal plant <br />production. <br />(4) If the plant has not supplied concrete to the project for a period of greater than thirty (30) <br />calendar days, perform a verification strength test. <br />(5) Cast 3 cylinders plus one additional cylinder to embed the temperature sensor or 3 beams <br />for each verification strength test. <br />(6) The Engineer will test the concrete strength specimens for verification of the maturity <br />curve as close to the maturity value determined to represent the opening, loading or form <br />removal strength criteria in accordance with the Concrete Manual. <br />(7) Record the results of verification test on the Concrete Maturity -Strength Verification <br />form and submit an updated copy with the newest test result to the Engineer the day that <br />the verification test is completed. <br />(8) The Engineer may direct additional verification testing as necessary. <br />(9) Submit electronic data from the maturity meters or temperature loggers in a comma - <br />delimited (.txt or .csv) file format to the Engineer, which includes at least the project <br />number, date and location of the meters or loggers. <br />S-32.37 MnDOT 2461.3.G.6.d(4), 2461.3.G.6.d(5) and 2461.3.G.d(6) shall be deleted. <br />S-32.38 <br />following: <br />MnDOT 2461.3.G.7.b, Table 2461-25 and Table 2461-26 shall be deleted and replaced with the <br />G.7.b Non -Conforming Material <br />Only place concrete meeting the slump requirements in the work. If the Contractor places <br />concrete not meeting the slump requirements into the work, the Engineer will not accept non -conforming <br />concrete at the contract unit price. <br />